State: Odisha District: Koraput Block: Pottangi Gram Panchayat: Pottangi
Work Code: OD/363/3478/119907/430025/00035589 (Completion of incomplete Kalyan Mandap, Pottangi)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Pottangi Proposal Date: -
Date of Commencement: 16-03-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Kalyan Mandap Project Type: Repair and Maintenance
Name of Executant: PRASANNA GARADA
Administrative Approval Details
Approval No.: OD/363/3478/119907/430025/00035589/AS
Technical Sanction Details
Technical Sanction No.: OD/363/3478/119907/430025/00035589/TS
Fund Sanction No.: 1313
Fund Sanction Amount (in Rs.): 350000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM255 BRM253 BRM141
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 45 Sqm 0.043 1.935 0.018 0.81 - - - - - -
2 Painting(AR0918cb) :.Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 312.396 Sqm - - - - 0.125 39.0495 0.090322580645161 28.216412903226 - -
3 Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 35.64 Sqm - - - - - - - - 0.125 4.455
Total Qty 1.935 0.81 39.0495 28.216412903226 4.455
Rate Per Unit 0 40.25 0 0 0
Total Amount 0 32.6025 0 0 0
Total Royalty Amount (in Rs.): 32.6025