State: Odisha District: Kendrapara Block: Rajkanika Gram Panchayat: Parinupada-Habalagand
Work Code: OD/360/3441/119225/395709/00060693 (Maint. of cc Road Mirjapur Village Road)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Rajkanika Proposal Date: -
Date of Commencement: 04-04-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: DEEPAK KUMAR BEHERA
Administrative Approval Details
Approval No.: OD/360/3441/119225/395709/00060693/AS
Technical Sanction Details
Technical Sanction No.: OD/360/3441/119225/395709/00060693/TS
Fund Sanction No.: 32004
Fund Sanction Amount (in Rs.): 350000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Skilled Un-Skilled Semi-Skilled
562 462 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 12.96 Cubic Meter 3.9 50.544 - - 0.18 2.3328
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 32.4 Cubic Meter 4.6 149.04 - - 0.68 22.032
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 43.2 Square Meter - - 0.05 2.16 0.05 2.16
Total Qty 26.5248 199.584 2.16
Rate Per Man Day 562 462 512
Total Amount 14906.9376 92207.808 1105.92
Total Labour Amount (in Rs.): 108220.6656