State: Odisha District: Malkangiri Block: Chitrakonda Gram Panchayat: Chitrakonda
Work Code: OD/364/3483/119962/430673/00044622 (Improvement of Road with CC Drain at Daily Market Chitrakonda)
Project Category: Water Body
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Chitrakonda Proposal Date: -
Date of Commencement: 28-02-2026 Date of Completion: 17-03-2026
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance and improvement of Road infrastructure
Project Sub-Category: Drainage Work Project Type: Upgradation or Improvement
Name of Executant: SUROJ KANTA ROUTA
Administrative Approval Details
Approval No.: OD/364/3483/119962/430673/00044622/AS
Technical Sanction Details
Technical Sanction No.: OD/364/3483/119962/430673/00044622/TS
Fund Sanction No.: 29133
Fund Sanction Amount (in Rs.): 800000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM341 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 6.825 Cum - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 3.4125 Cum 1 3.4125 - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 6.1425 Cum - - 2.29 14.066325 0.48 2.9484 0.96 5.8968 - - - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 70.8225 Cum - - 3.23 228.756675 0.45 31.870125 - - 0.9 63.74025 - - - - - -
5 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 26.169145 Qntl - - - - - - - - - - 1.05 27.47760225 - - - -
6 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 18.1 Sqm - - - - - - - - - - - - 0.00267 0.048327 0.000614 0.0111134
Total Qty 3.4125 242.823 34.818525 5.8968 63.74025 27.47760225 0.048327 0.0111134
Rate Per Unit 40.25 0 96.25 208.5 208.5 0 0 0
Total Amount 137.353125 0 3351.28303125 1229.4828 13289.842125 0 0 0
Total Royalty Amount (in Rs.): 18007.96108125