State: Odisha District: Sundargarh Block: Subdega Gram Panchayat: Subdega
Work Code: OD/373/3587/121751/384056/00097928 (Construction of CC road from PWD road to Anchalik Degree college GP -Subdega)
Project Category: Road
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Subdega Proposal Date: -
Date of Commencement: 22-03-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: ASIT PATEL
Administrative Approval Details
Approval No.: OD/373/3587/121751/384056/00097928/AS
Technical Sanction Details
Technical Sanction No.: OD/373/3587/121751/384056/00097928/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 209565
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 23.083 Cum - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 13.817 Cum 1 13.817 - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 15.703 Cum - - 2.29 35.95987 0.48 7.53744 0.96 15.07488 - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 12.915 Cum - - 3.23 41.71545 0.45 5.81175 - - 0.9 11.6235
Total Qty 13.817 77.67532 13.34919 15.07488 11.6235
Rate Per Unit 110.25 0 110.25 409.5 409.5
Total Amount 1523.32425 0 1471.7481975 6173.16336 4759.82325
Total Royalty Amount (in Rs.): 13928.0590575