State: Odisha District: Balasore Block: Soro Gram Panchayat: Madhusuidanpur
Work Code: OD/346/3309/116318/393755/00066243 (Const. of cc road from Dusasan house to Uma Nayak house MSPUR Madhusudanpur G.P)
Project Category: Road
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Soro Proposal Date: -
Date of Commencement: 30-03-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: Monalisa Pati
Administrative Approval Details
Approval No.: OD/346/3309/116318/393755/00066243/AS
Technical Sanction Details
Technical Sanction No.: OD/346/3309/116318/393755/00066243/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 250000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 6.8809824 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 13.968394272 Cum 1 13.968394272 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 19.748419488 Cum - - 2.29 45.22388062752 0.48 9.47924135424 0.96 18.95848270848 - - - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 67.726287 Sqm - - - - - - - - 0.00267 0.18082918629 0.126 8.533512162 - -
5 Earth Work (AR0110) :.Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 150.50286 Sqm - - - - - - - - - - - - - -
6 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 11.468304 Cum - - 3.23 37.04262192 0.45 5.1607368 - - - - - - 0.9 10.3214736
7 Earth Work (AR0114a) :.Filling of foundation with escalated earth - Filling in foundation and plinth with excavated materials in Hard soil / Gravelly soil including watering and ramming as directed by the Engineer-in-charge. 0.194819584 Cum - - - - - - - - - - - - - -
Total Qty 13.968394272 82.26650254752 14.63997815424 18.95848270848 0.18082918629 8.533512162 10.3214736
Rate Per Unit 979.85 570.467 984.79 1466.56 58573.086 229.106 1867.93
Total Amount 13686.931127419 46930.324908776 14417.304086514 27803.752400948 10591.723479874 1955.0788373872 19279.790181648
Total Material Amount (in Rs.): 134664.90502257