State: Odisha District: Nabarangpur Block: Jhorigam Gram Panchayat: Dhamanaguda
Work Code: OD/366/3515/120451/427614/00056399 (Construction work of VSS building at Dhamanaguda village of Dhamanaguda GP)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Jhorigam Proposal Date: 22-08-2024
Date of Commencement: 16-03-2026 Date of Completion: -
Scheme Name: Construction of Vana Suraksha Samiti Building Scheme Component Name: Construction of Buildings for Vana Suraksha Samiti
Project Sub-Category: Vana Suraksha Samiti Building Project Type: New Work
Name of Executant: Sagram Marndi
Administrative Approval Details
Approval No.: OD/366/3515/120451/427614/00056399/AS
Technical Sanction Details
Technical Sanction No.: OD/366/3515/120451/427614/00056399/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 850000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM060 BRM052 BRM162 BRM341 BRM104 BRM092 BRM094 BRM084 BRMMR0025 BRM006 BRM255 BRM252 BRM142 BRM137 BRM141 BRMMR0027 BRM130
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0122Aia) :.Earthwork in all kinds of soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift - Earthwork in all kinds of soil in foundation and plinth within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge 28.2582 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 23.8659 Cum 1 23.8659 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 15.774475 Cum - - 2.29 36.12354775 0.48 7.571748 0.96 15.143496 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 18.78304945 Cum - - 3.4733 65.239165654685 0.45 8.4523722525 - - 0.36 6.761897802 0.54 10.142846703 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 19.1 Qntl - - - - - - - - - - - - 0.8 15.28 1.05 20.055 - - - - - - - - - - - - - - - - - - - - - - - - - -
6 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 108.1054 Sqm - - - - - - - - - - - - - - - - 0.00267 0.288641418 0.126 13.6212804 - - - - - - - - - - - - - - - - - - - - - -
7 R.C.C. Work (AR0410e) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. Lintels Data for 7.8 sqm 9.822 Sqm - - - - - - - - - - - - - - - - 0.0052948717948718 0.052006230769231 - - 0.26923076923077 2.6443846153846 - - - - - - - - - - - - - - - - - - - -
8 R.C.C. Work (AR0410d) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 13.096 Sqm - - - - - - - - - - - - - - - - 0.0051904761904762 0.067974476190476 - - - - 0.55238095238095 7.233980952381 - - - - - - - - - - - - - - - - - -
9 R.C.C. Work (AR0410a) :.Centring & Shuttering for R.C.C. floor and roof slabs, landings,balconies, projecting sun shades and chajjas - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height 47.768 Sqm - - - - - - - - - - - - - - - - 0.0050222222222222 0.23990151111111 - - - - 0.62222222222222 29.722311111111 - - - - - - - - - - - - - - - - - -
10 Masonry Brick Work (AR0603ci) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 22.146585 Cum - - 0.672 14.88250512 0.28 6.2010438 - - - - - - - - - - - - - - - - - - 1 22.146585 400 8858.634 - - - - - - - - - - - - - -
11 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 2.7198 Qntl - - - - - - - - - - - - - - 1 2.7198 - - - - - - - - - - - - - - - - - - - - - - - - - -
12 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 130.0236 Sqm - - 0.043 5.5910148 0.018 2.3404248 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
13 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 81.385 Sqm - - 0.0358 2.913583 0.015 1.220775 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
14 Painting(AR0918ca) :.Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 81.385 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 10.173125 0.084 6.83634 - - - - - - - - - -
15 Painting(AR0922a) :.Finishing wall surface with two coats with distemper of approved shades above one coat oil bound Primer on new work (Inside) - Finishing wall surface with two coats with distemper of approved shades above one coat oil bound Primer on new work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 130.023 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 10.921932 0.25 32.50575 - - - - - - - -
16 Painting(AR0903b) :.Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. 27.50625 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.054 1.4853375 0.125 3.43828125 - - - -
17 Flooring (AR0816) :.Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. 36.895 Sqm - - 0.2737 10.0981615 0.013 0.479635 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 36.895 1 36.895
18 Flooring (AR0817a) :.Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge 9.2325 Sqm - - 0.1375 1.26946875 0.015 0.1384875 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 9.2325 1 9.2325
Total Qty 23.8659 136.11744657468 26.4044863525 15.143496 6.761897802 10.142846703 15.28 22.7748 0.64852363607082 13.6212804 2.6443846153846 36.956292063492 22.146585 8858.634 10.173125 17.758272 32.50575 1.4853375 3.43828125 46.1275 46.1275
Rate Per Unit 413.05 597.677 417.24 1466.56 1889.98 1853.6 90.1 6219.847 58620.646 276.666 287.666 297.726 33 5.4818 195.15677 125.86677 70.46677 137.96677 205.70677 8.5 462.9538891
Total Amount 9857.809995 81354.267116418 11017.007885717 22208.84549376 12779.851607824 18800.780648681 1376.728 141655.7714556 38016.87449274 3768.5451631464 760.69954476923 11002.849010895 730.837305 48561.2598612 1985.3542158063 2235.1763374214 2290.5752089275 204.92721723488 707.27773028906 392.08375 21354.90551946
Total Material Amount (in Rs.): 431062.42755989