State: Odisha District: Angul Block: Talacher Gram Panchayat: Kandhal
Work Code: OD/344/3283/115752/403961/00039155 (Maintenance of Kandhal Primary School )
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Talacher Proposal Date: -
Date of Commencement: 04-04-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Primary School Building
Project Sub-Category: Elementary School Project Type: Repair and Maintenance
Name of Executant: anayananda
Administrative Approval Details
Approval No.: OD/344/3283/115752/403961/00039155/AS
Technical Sanction Details
Technical Sanction No.: OD/344/3283/115752/403961/00039155/TS
Fund Sanction No.: 34989
Fund Sanction Amount (in Rs.): 300000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM174 BRM340 BRM028 BRM131 BRMMR0027 BRM255 BRM253 BRM142
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Other Building Items. (AR1901B) :.Vitrified Tile 600mmx600mm Plain Ivory - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) 151.954 Sqm 0.0076 1.1548504 0.1074 16.3198596 0.021 3.191034 1 151.954 - - - - - - - -
2 Flooring (AR0817aa) :.Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. 12.006 Sqm - - 0.1375 1.650825 0.015 0.18009 1 12.006 1 12.006 - - - - - -
3 Painting(AR0918hk) :.Finishing wall with two coats weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work(Outside)(For repair and maintenance). - Finishing wall with two coats weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 589.89 Sqm - - - - - - - - - - 0.125 73.73625 0.090322580645161 53.280387096774 - -
4 Painting(AR0922bk) :.Finishing wall two coats with distemper of approved shades with one coat waterbound Primer on new work (Inside)(For repair and maintenance) - Finishing wall two coats with distemper of approved shades with one coat water bound Primer on new work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For repair and maintenance). 187.215 Sqm - - - - - - - - - - - - 0.084 15.72606 0.25 46.80375
Total Qty 1.1548504 17.9706846 3.371124 163.96 12.006 73.73625 69.006447096774 46.80375
Rate Per Unit 2047.912 552.372 548.19 662.3175001 8.5 195.09732 159.33732 70.40732
Total Amount 2365.0319923648 9926.5029938712 1848.01646556 108593.5773164 102.051 14385.74476185 10995.302343122 3295.32660345
Total Material Amount (in Rs.): 151511.55347661