State: Odisha District: Khordha Block: Banapur Gram Panchayat: Gambharimunda
Work Code: OD/362/3458/119569/408334/00070328 (PRESERVATION AND DEVELOPMENT OF TANK AT KHAJURIA OF GAMBHARIMUNDA)
Project Category: Water Body
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Banapur Proposal Date: -
Date of Commencement: 07-03-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Preservation and Development of Water Bodies
Project Sub-Category: Tank Project Type: New Work
Name of Executant: pramoda kumar nanda
Administrative Approval Details
Approval No.: OD/362/3458/119569/408334/00070328/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3458/119569/408334/00070328/TS
Fund Sanction No.: 22569
Fund Sanction Amount (in Rs.): 663375
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Skilled Un-Skilled Highly-Skilled Semi-Skilled
562 462 612 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 57.2565696 Cubic Meter 3.9 223.30062144 - - 0.18 10.306182528 - -
2 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 42.9424272 Cubic Meter 0.516 22.1582924352 - - - - - -
3 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 7.1570712 Cubic Meter 0.1236 0.88461400032 - - - - - -
4 Masonry Stone Work (AR0717i) : Laterite stone masonry in cement mortar (1:6) in superstructure - Laterite stone masonry in cement mortar (1:6) in superstructure cost conveyance, royalty, taxes of all materials, labor, required for the work, etc. complete and as per direction of the Engineer-in-charge. 39.101491027853 Cubic Meter 1.21 47.312804143702 1.41 55.133102349273 1.05 41.056565579246 2.295 89.737921908923
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 189.800829 Square Meter - - 0.05 9.49004145 0.05 9.49004145 - -
6 Plastering (AR1008) : 20mm thick cement Plaster in CM (1:6) over brick work in inside. - 20mm thick cement Plaster in CM (1:6) for stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 116.5608790142 Square Meter 0.24 27.974610963408 - - 0.16 18.649740642272 - -
Total Qty 79.502530199518 321.63094298263 89.737921908923 64.623143799273
Rate Per Man Day 562 462 612 512
Total Amount 44680.421972129 148593.49565798 54919.608208261 33087.049625228
Total Labour Amount (in Rs.): 281280.57546359