State: Odisha District: Nabarangpur Block: Papadahandi Gram Panchayat: Manigam
Work Code: OD/366/3519/120520/427680/00059334 (DEVELOPMENT OF HAAT PINDI, SHED & OTHER FACILITIES AT MUDIGUDA NEAR KATHIGUDI MANDIR)
Project Category: Other Infrastructure
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Papadahandi Proposal Date: -
Date of Commencement: 15-01-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Development of Rural Haat
Project Sub-Category: Rural Haat Project Type: Upgradation or Improvement
Name of Executant: PRANATI SAHOO
Administrative Approval Details
Approval No.: OD/366/3519/120520/427680/00059334/AS
Technical Sanction Details
Technical Sanction No.: OD/366/3519/120520/427680/00059334/TS
Fund Sanction No.: 31804
Fund Sanction Amount (in Rs.): 1000000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled Highly-Skilled
462 562 512 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 28.08 Cubic Meter 0.516 14.48928 - - - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 53.985 Cubic Meter 0.1236 6.672546 - - - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 88.395 Cubic Meter 3.9 344.7405 - - 0.18 15.9111 - -
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 28.08 Cubic Meter 4.6 129.168 - - 0.68 19.0944 - -
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 96 Square Meter - - 0.05 4.8 0.05 4.8 - -
6 Roofing (AR1132) : Supplying, feeting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties - Supplying, fitting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. including cost of fitting, Labour and material etc. complete as per direction of Engineer-in-Charge 176.64 Square Meter 0.21505376344086 37.987096774194 - - - - 0.16129032258065 28.490322580645
Total Qty 533.05742277419 39.8055 4.8 28.490322580645
Rate Per Man Day 462 562 512 612
Total Amount 246272.52932168 22370.691 2457.6 17436.077419355
Total Labour Amount (in Rs.): 288536.89774103