| State: Odisha |
District: Kandhamal |
Block: Kotagarh |
Gram Panchayat: Durgapanga |
Work Code: OD/359/3428/118946/417228/00050617 (Renovation of Bandapipili Rural Haat)
Project Category: Other Infrastructure
| Financial Year: 2025-26 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Kotagarh |
Proposal Date: - |
| Date of Commencement: - |
Date of Completion: - |
| Scheme Name: 5th SFC Grant in Aid |
Scheme Component Name: Maintenance of Capital Assets |
| Project Sub-Category: Rural Haat |
Project Type: Renovation or Rejuvenation |
| Name of Executant: |
|
Administrative Approval Details
Approval No.:
Technical Sanction Details
Technical Sanction No.:
Fund Sanction No.: 33742
Fund Sanction Amount (in Rs.): 400000
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Un-Skilled
|
Skilled
|
Semi-Skilled
|
Highly-Skilled
|
| 462 |
562 |
512 |
612 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
R.C.C. Work (AR0404Aa) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.)
|
0.6348 |
Cubic Meter |
1.3333 |
0.84637884 |
0.1323 |
0.08398404 |
0.175 |
0.11109 |
- |
- |
| 2 |
Roofing (AR1132) : Supplying, feeting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties - Supplying, fitting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. including cost of fitting, Labour and material etc. complete as per direction of Engineer-in-Charge
|
450 |
Square Meter |
0.21505376344086 |
96.774193548387 |
- |
- |
- |
- |
0.16129032258065 |
72.58064516129 |
| 3 |
Iron Work (AR1701) : Labour for hoisting joints, trusses and placing in position - Labour for hoisting joints, trusses and placing in position with all cost of labour and machinery and T & P required for the work etc. as per direction of Engineer-in-Charge.
|
117.358 |
Quintal |
0.33464566929134 |
39.273346456693 |
1.9685039370079 |
231.01968503937 |
- |
- |
- |
- |
| 4 |
Painting (AR0901a) : Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge.
|
100 |
Square Meter |
0.053763440860215 |
5.3763440860215 |
- |
- |
- |
- |
0.053763440860215 |
5.3763440860215 |
| 5 |
Painting (AR0918c) : Finishing wall with two coat water proofing cement paint including one coat cement wash on the outer surface of approved shade on new work (Outside) - Finishing wall with two coat water proofing cement paint including one coat cement wash on the outer surface of approved shade on new work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside)
|
100 |
Square Meter |
0.042752688172043 |
4.2752688172043 |
- |
- |
0.0080645161290323 |
0.80645161290323 |
0.022 |
2.2 |
| Total Qty |
146.54553174831 |
0.91754161290323 |
231.10366907937 |
80.156989247312 |
| Rate Per Man Day |
462 |
562 |
512 |
612 |
| Total Amount |
67704.035667717 |
515.65838645161 |
118325.07856864 |
49056.077419355 |
Total Labour Amount (in Rs.): 235600.85004216