State: Odisha District: Khordha Block: Balipatna Gram Panchayat: Mukundadaspur
Work Code: OD/362/3457/275275/407672/00089137 (Repairing of CC road at Nahak Sahi Mangala Temple)
Project Category: Road
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Balipatna Proposal Date: -
Date of Commencement: 17-03-2026 Date of Completion: -
Scheme Name: SFC Devolution of Fund Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI
Project Sub-Category: CC Road Project Type: Repair and Maintenance
Name of Executant: Sushree
Administrative Approval Details
Approval No.: OD/362/3457/275275/407672/00089137/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3457/275275/407672/00089137/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 51919
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 0.45 Cubic Meter 0.516 0.2322 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 0.225 Cubic Meter 0.1236 0.02781 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 3.9819 Cubic Meter 3.9 15.52941 - - 0.18 0.716742
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 3.5319 Cubic Meter 4.6 16.24674 - - 0.68 2.401692
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 7.632 Square Meter - - 0.05 0.3816 0.05 0.3816
Total Qty 32.03616 3.500034 0.3816
Rate Per Man Day 462 562 512
Total Amount 14800.70592 1967.019108 195.3792
Total Labour Amount (in Rs.): 16963.104228