| State: Odisha |
District: Kendujhar |
Block: Joda |
Gram Panchayat: Laidapada |
Work Code: OD/361/3451/275396/385289/00049428 (REPAIR & MAINTENENCE OF ROAD FROM BALARAM NAIK HOUSE TO DINABANDHU HOUSE)
Project Category: Road
| Financial Year: 2024-25 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Joda |
Proposal Date: 07-12-2024 |
| Date of Commencement: 19-02-2026 |
Date of Completion: 28-02-2026 |
| Scheme Name: 5th SFC Grant in Aid |
Scheme Component Name: All Weather Connectivity |
| Project Sub-Category: CC Road |
Project Type: Repair and Maintenance |
| Name of Executant: ARCHANA JENA |
|
Administrative Approval Details
Approval No.: OD/361/3451/275396/385289/00049428/AS
Technical Sanction Details
Technical Sanction No.: OD/361/3451/275396/385289/00049428/TS
Fund Sanction No.: 28963
Fund Sanction Amount (in Rs.): 143788
ACTIVITY STATEMENT
| Sl.No. |
Activity taken |
Unit |
Quantity |
Unit Price (in Rs.) |
Total (in Rs.) |
| 1 |
Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge.
|
Cum |
16.576875 |
8337.39631234 |
138207.97649512 |
| 2 |
R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc
|
Sqm |
9.9975 |
216.39264180804 |
2163.3854364759 |
Total Amount (in Rs.): 140371.3619316
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Un-Skilled
|
Skilled
|
Semi-Skilled
|
| 462 |
562 |
512 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge.
|
16.576875 |
Cubic Meter |
4.6 |
76.253625 |
- |
- |
0.68 |
11.272275 |
| 2 |
R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc
|
9.9975 |
Square Meter |
- |
- |
0.05 |
0.499875 |
0.05 |
0.499875 |
| Total Qty |
76.253625 |
11.77215 |
0.499875 |
| Rate Per Man Day |
462 |
562 |
512 |
| Total Amount |
35229.17475 |
6615.9483 |
255.936 |
Total Labour Amount (in Rs.): 42101.05905
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM056 |
BRM104 |
BRM092 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
16.576875 |
Cum |
3.23 |
53.54330625 |
0.45 |
7.45959375 |
0.9 |
14.9191875 |
- |
- |
- |
- |
| 2 |
R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc |
9.9975 |
Sqm |
- |
- |
- |
- |
- |
- |
0.00267 |
0.026693325 |
0.126 |
1.259685 |
| Total Qty |
53.54330625 |
7.45959375 |
14.9191875 |
0.026693325 |
1.259685 |
| Rate Per Unit |
602.727 |
1708.91 |
2691.91 |
58620.646 |
276.666 |
| Total Amount |
32271.996346144 |
12747.774355313 |
40161.110023125 |
1564.7799553879 |
348.51201021 |
Total Material Amount (in Rs.): 87094.172690179
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM340 |
BRM028 |
BRM056 |
BRM104 |
BRM092 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
16.576875 |
Cum |
3.23 |
53.54330625 |
0.45 |
7.45959375 |
0.9 |
14.9191875 |
- |
- |
- |
- |
| 2 |
R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc |
9.9975 |
Sqm |
- |
- |
- |
- |
- |
- |
0.00267 |
0.026693325 |
0.000614 |
0.006138465 |
| Total Qty |
53.54330625 |
7.45959375 |
14.9191875 |
0.026693325 |
0.006138465 |
| Rate Per Unit |
0 |
50.25 |
293.5 |
0 |
0 |
| Total Amount |
0 |
374.8445859375 |
4378.78153125 |
0 |
0 |
Total Royalty Amount (in Rs.): 4753.6261171875
ADDITION COMPONENT
| S/N |
Item Name |
Amount (in Rs.) |
| 1 |
Provision for Contingency @
Rs. 1438
|
Rs. 1438 |
| 2 |
Display Citizen Board @
Rs. 1000
|
Rs. 1000 |
| 3 |
Any Other Lumpsum @
Rs. 977
|
Rs. 977 |
Total Addition Component Amount (in Rs.): 3415
DEDUCTION COMPONENT
| Sl.No. |
Item Name |
Amount (in Rs.) |
| No data to display. |
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 143786.3619316