State: Odisha District: Nabarangpur Block: Jhorigam Gram Panchayat: Dhodra
Work Code: OD/366/3515/120452/427401/00072167 (Repair and Maintenance of PHC Dhodra)
Project Category: Building
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Jhorigam Proposal Date: 07-02-2023
Date of Commencement: - Date of Completion: -
Scheme Name: Asset Management Health and Family Welfare Department Scheme Component Name: Self/Personal Deposit
Project Sub-Category: Primary Health Centre Project Type: Repair and Maintenance
Name of Executant:
Administrative Approval Details
Approval No.:
Technical Sanction Details
Technical Sanction No.:
Fund Sanction No.: 2546
Fund Sanction Amount (in Rs.): 59000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Flooring (AR0816jk) : Fixing Chequred Tiles in floor, treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (For repair and maintenance). - Fixing Chequred Tiles in floor, treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the Chequred tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge(For repair and maintenance) . Sqm 59.8 961.694225909 57509.314709358
Total Amount (in Rs.): 57509.314709358
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Highly-Skilled Semi-Skilled
462 612 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Flooring (AR0816jk) : Fixing Chequred Tiles in floor, treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (For repair and maintenance). - Fixing Chequred Tiles in floor, treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the Chequred tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge(For repair and maintenance) . 59.8 Square Meter 0.216 12.9168 0.55 32.89 0.216 12.9168
Total Qty 12.9168 12.9168 32.89
Rate Per Man Day 462 612 512
Total Amount 5967.5616 7905.0816 16839.68
Total Labour Amount (in Rs.): 30712.3232
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM134 BRMMR0027 BRM340 BRM028
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Flooring (AR0816jk) :.Fixing Chequred Tiles in floor, treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (For repair and maintenance). - Fixing Chequred Tiles in floor, treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the Chequred tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge(For repair and maintenance) . 59.8 Sqm 1 59.8 1 59.8 0.2737 16.36726 0.013 0.7774
Total Qty 59.8 59.8 16.36726 0.7774
Rate Per Unit 231.48 8.5 597.677 417.24
Total Amount 13842.504 508.3 9782.33485502 324.362376
Total Material Amount (in Rs.): 24457.50123102
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Flooring (AR0816jk) :.Fixing Chequred Tiles in floor, treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (For repair and maintenance). - Fixing Chequred Tiles in floor, treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the Chequred tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge(For repair and maintenance) . 59.8 Sqm 0.2737 16.36726 0.013 0.7774
Total Qty 16.36726 0.7774
Rate Per Unit 0 150.92
Total Amount 0 117.325208
Total Royalty Amount (in Rs.): 117.325208
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Provision for Contingency @ Rs. 590 Rs. 590
2 Display Citizen Board @ Rs. 900.65 Rs. 900.65
Total Addition Component Amount (in Rs.): 1490.65
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 58999.964709358