State: Odisha District: Puri Block: Gop Gram Panchayat: Gadabhingura
Work Code: OD/369/3539/120940/409821/00076151 (REPAIR AND RENOVATION OF ROAD FROM KADAMBA Pokhari TO HIGH SCHOOL)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Gop Proposal Date: 30-12-2025
Date of Commencement: 20-01-2026 Date of Completion: -
Scheme Name: Bikashita Gaon Bikashita Odisha Scheme Component Name: Viksit Gaon Vikshit Odisha (VGVO)
Project Sub-Category: CC Road Project Type: Renovation or Rejuvenation
Name of Executant: LOJISMITA MOHAPATRO
Administrative Approval Details
Approval No.: OD/369/3539/120940/409821/00076151/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3539/120940/409821/00076151/TS
Fund Sanction No.: 360000
Fund Sanction Amount (in Rs.): 360000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc Sqm 34.684 216.23489289764 7499.8910252617
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. Cum 43.9566 7823.61900228 343899.69103562
Total Amount (in Rs.): 351399.58206088
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Semi-Skilled Skilled Un-Skilled
512 562 462
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 34.684 Square Meter - - 0.05 1.7342 0.05 1.7342
2 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 43.9566 Cubic Meter 4.6 202.20036 - - 0.68 29.890488
Total Qty 1.7342 31.624688 202.20036
Rate Per Man Day 512 562 462
Total Amount 887.9104 17773.074656 93416.56632
Total Labour Amount (in Rs.): 112077.551376
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM104 BRM092 BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 34.684 Sqm 0.00267 0.09260628 0.126 4.370184 - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 43.9566 Cum - - - - 3.23 141.979818 0.45 19.78047 0.9 39.56094
Total Qty 0.09260628 4.370184 141.979818 19.78047 39.56094
Rate Per Unit 58573.086 229.106 601.352 780.67 2556.62
Total Amount 5424.2356025801 1001.235375504 85379.847513936 15442.0195149 101142.2904228
Total Material Amount (in Rs.): 208389.62842972
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM104 BRM092 BRM340 BRM028 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 34.684 Sqm 0.00267 0.09260628 0.000614 0.021295976 - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 43.9566 Cum - - - - 3.23 141.979818 0.45 19.78047 0.9 39.56094
Total Qty 0.09260628 0.021295976 141.979818 19.78047 39.56094
Rate Per Unit 0 0 0 75.25 309.5
Total Amount 0 0 0 1488.4803675 12244.11093
Total Royalty Amount (in Rs.): 13732.5912975
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Provision for Contingency @ Rs. 3600 Rs. 3600
2 Display Citizen Board @ Rs. 5000 Rs. 5000
3 Any Other Lumpsum @ Rs. 0.41 Rs. 0.41
Total Addition Component Amount (in Rs.): 8600.41
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 359999.99206088