| State: Odisha | District: Cuttack | Block: Cuttacksadar | Gram Panchayat: Arilo |
| Financial Year: 2025-26 | Execution Level: ps |
| Executing Agency: Panchayat Samiti, Cuttacksadar | Proposal Date: - |
| Date of Commencement: - | Date of Completion: - |
| Scheme Name: 5th SFC Grant in Aid | Scheme Component Name: Maintenance of Primary School Building |
| Project Sub-Category: Elementary School | Project Type: Repair and Maintenance |
| Name of Executant: |
| Sl.No. | Activity taken | Unit | Quantity | Unit Price (in Rs.) | Total (in Rs.) |
|---|---|---|---|---|---|
| 1 | Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge | Cum | 3.6844121152 | 240.77592 | 887.11771669643 |
| 2 | Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. | Cum | 3.20405724672 | 628.879732 | 2014.9666626299 |
| 3 | Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. | Cum | 3.50005842048 | 6079.73013386 | 21279.410649263 |
| 4 | Plastering (AR1004) : 12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. | Sqm | 6.7824392568 | 167.9967296772 | 1139.4276143767 |
| 5 | Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. | Sqm | 14.8551897 | 241.877331262 | 3593.1336400268 |
| 6 | Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. | Cum | 2.37426173952 | 7542.78088082 | 17908.536054914 |
| 7 | Plastering (AR1017) : 20mm thick cement Plaster in CM (1:4) over masonry work in inside. - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. | Sqm | 17.2423880268 | 264.5620007096 | 4561.6806733815 |
| 8 | Other Building Items. (AR1901Bb) : Vitrified Tile 600mmx600mm industrial floor Tile - Supplying, fitting & fixing Vitrified industrial floor Tile of premium grade having thickness 8mm to 10mm confirming to IS 4457 of size 300mmx300mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all work all materials, taxes, labor, T&P , etc. complete as per direction of Engineer-in-charge. | Sqm | 13.00642 | 927.5865123346 | 12064.579765759 |
| 9 | Painting (AR0903) : Painting two coats of enamel paint in inner surface paint (Inner surface) - Painting two coats of enamel paint in inner surface paint including all costs of labour, Paint, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Inside) | Sqm | 21.553496 | 163.99542665202 | 3534.6747723626 |
| 10 | Painting (AR0922ak) : Finishing wall two coats with distemper of approved shades with one coat oilbound Primer on new work (Inside)(For repair and maintenance). - Finishing wall two coats with distemper of approved shades with one coat oil bound Primer on new work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For repair and maintenance). | Sqm | 113.713272 | 150.18591200128 | 17078.13146197 |
| 11 | Painting (AR0917h) : Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work (Outside) - Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) | Sqm | 114.1317814344 | 129.94070563185 | 14830.364214606 |
| 12 | R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc | Sqm | 11.00157326 | 216.23489289764 | 2378.9240155816 |
| Sl.No. | Activity Name | Quantity (A) | Unit | Un-Skilled | Skilled | Highly-Skilled | Semi-Skilled | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 462 | 562 | 612 | 512 | ||||||||
| Qty/Unit (B) | Total Qty (A*B) | Qty/Unit (B) | Total Qty (A*B) | Qty/Unit (B) | Total Qty (A*B) | Qty/Unit (B) | Total Qty (A*B) | ||||
| 1 | Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge | 3.6844121152 | Cubic Meter | 0.516 | 1.9011566514432 | - | - | - | - | - | - |
| 2 | Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. | 3.20405724672 | Cubic Meter | 0.1236 | 0.39602147569459 | - | - | - | - | - | - |
| 3 | Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. | 3.50005842048 | Cubic Meter | 3.9 | 13.650227839872 | - | - | 0.18 | 0.6300105156864 | - | - |
| 4 | Plastering (AR1004) : 12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. | 6.7824392568 | Square Meter | 0.12 | 0.813892710816 | - | - | 0.14 | 0.949541495952 | - | - |
| 5 | Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. | 14.8551897 | Square Meter | 0.24 | 3.565245528 | - | - | 0.16 | 2.376830352 | - | - |
| 6 | Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. | 2.37426173952 | Cubic Meter | 4.6 | 10.921604001792 | - | - | 0.68 | 1.6144979828736 | - | - |
| 7 | Plastering (AR1017) : 20mm thick cement Plaster in CM (1:4) over masonry work in inside. - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. | 17.2423880268 | Square Meter | 0.24 | 4.138173126432 | - | - | 0.16 | 2.758782084288 | - | - |
| 8 | Other Building Items. (AR1901Bb) : Vitrified Tile 600mmx600mm industrial floor Tile - Supplying, fitting & fixing Vitrified industrial floor Tile of premium grade having thickness 8mm to 10mm confirming to IS 4457 of size 300mmx300mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all work all materials, taxes, labor, T&P , etc. complete as per direction of Engineer-in-charge. | 13.00642 | Square Meter | 0.216 | 2.80938672 | - | - | - | - | 0.216 | 2.80938672 |
| 9 | Painting (AR0903) : Painting two coats of enamel paint in inner surface paint (Inner surface) - Painting two coats of enamel paint in inner surface paint including all costs of labour, Paint, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Inside) | 21.553496 | Square Meter | 0.11827956989247 | 2.5493382365591 | - | - | - | - | 0.13440860215054 | 2.8969752688172 |
| 10 | Painting (AR0922ak) : Finishing wall two coats with distemper of approved shades with one coat oilbound Primer on new work (Inside)(For repair and maintenance). - Finishing wall two coats with distemper of approved shades with one coat oil bound Primer on new work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For repair and maintenance). | 113.713272 | Square Meter | 0.11807870967742 | 13.427116430957 | - | - | - | - | 0.10787870967742 | 12.267241056557 |
| 11 | Painting (AR0917h) : Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work (Outside) - Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) | 114.1317814344 | Square Meter | 0.096763440860215 | 11.043783883099 | - | - | - | - | 0.089763440860215 | 10.244861413058 |
| 12 | R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc | 11.00157326 | Square Meter | - | - | 0.05 | 0.550078663 | 0.05 | 0.550078663 | - | - |
| Total Qty | 65.215946604665 | 8.8797410938 | 28.218464458432 | 0.550078663 | |||||||
| Rate Per Man Day | 462 | 562 | 612 | 512 | |||||||
| Total Amount | 30129.767331355 | 4990.4144947156 | 17269.700248561 | 281.640275456 | |||||||
| Sl.No. | Activity Name | Quantity (A) | Unit | BRM029 | BRM340 | BRM028 | BRM044 | BRM056 | BRM133 | BRM174 | BRM141 | BRM142 | BRM252 | BRM255 | BRM253 | BRM104 | BRM092 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | ||||
| 1 | Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge | 3.6844121152 | Cum | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 2 | Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. | 3.20405724672 | Cum | 1 | 3.20405724672 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 3 | Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. | 3.50005842048 | Cum | - | - | 2.29 | 8.0151337828992 | 0.48 | 1.6800280418304 | 0.96 | 3.3600560836608 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 4 | Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. | 6.7824392568 | Sqm | - | - | 0.0358 | 0.24281132539344 | 0.015 | 0.101736588852 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 5 | Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. | 14.8551897 | Sqm | - | - | 0.043 | 0.6387731571 | 0.018 | 0.2673934146 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 6 | Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. | 2.37426173952 | Cum | - | - | 3.23 | 7.6688654186496 | 0.45 | 1.068417782784 | - | - | 0.9 | 2.136835565568 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 7 | Plastering (AR1017) :.20mm thick cement Plaster in CM (1:4) over masonry work in inside. - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. | 17.2423880268 | Sqm | - | - | 0.0744 | 1.2828336691939 | 0.021 | 0.3620901485628 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 8 | Other Building Items. (AR1901Bb) :.Vitrified Tile 600mmx600mm industrial floor Tile - Supplying, fitting & fixing Vitrified industrial floor Tile of premium grade having thickness 8mm to 10mm confirming to IS 4457 of size 300mmx300mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all work all materials, taxes, labor, T&P , etc. complete as per direction of Engineer-in-charge. | 13.00642 | Sqm | - | - | 0.1074 | 1.396889508 | 0.021 | 0.27313482 | - | - | - | - | 1 | 13.00642 | 0.0076 | 0.098848792 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 9 | Painting(AR0903) :.Painting two coats of enamel paint in inner surface paint (Inner surface) - Painting two coats of enamel paint in inner surface paint including all costs of labour, Paint, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Inside) | 21.553496 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.125 | 2.694187 | - | - | - | - | - | - | - | - | - | - | - | - |
| 10 | Painting(AR0922ak) :.Finishing wall two coats with distemper of approved shades with one coat oilbound Primer on new work (Inside)(For repair and maintenance). - Finishing wall two coats with distemper of approved shades with one coat oil bound Primer on new work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For repair and maintenance). | 113.713272 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.25 | 28.428318 | 0.084 | 9.551914848 | - | - | - | - | - | - | - | - |
| 11 | Painting(AR0917h) :.Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work (Outside) - Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) | 114.1317814344 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.075 | 8.55988360758 | 0.090322580645161 | 10.308677032785 | - | - | - | - |
| 12 | R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc | 11.00157326 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.00267 | 0.0293742006042 | 0.126 | 1.38619823076 |
| Total Qty | 3.20405724672 | 19.245306861236 | 3.7528007966292 | 3.3600560836608 | 2.136835565568 | 13.00642 | 0.098848792 | 2.694187 | 28.428318 | 9.551914848 | 8.55988360758 | 10.308677032785 | 0.0293742006042 | 1.38619823076 | |||||||||||||||||
| Rate Per Unit | 413.05 | 563.767 | 417.99 | 2167.11 | 2595.71 | 587.9511111 | 2041.967 | 203.74787 | 70.24787 | 125.74787 | 195.03787 | 159.27787 | 58573.086 | 229.106 | |||||||||||||||||
| Total Amount | 1323.4358457577 | 10849.868913239 | 1568.633204983 | 7281.6111394622 | 5546.6054459005 | 7647.1390904333 | 201.84597125386 | 548.93486263169 | 1997.0287871827 | 1201.1329465574 | 1669.5014662703 | 1641.9441202998 | 1720.5375781711 | 317.5863318565 | |||||||||||||||||
| Sl.No. | Activity Name | Quantity (A) | Unit | BRM029 | BRM340 | BRM028 | BRM044 | BRM056 | BRM133 | BRM174 | BRM141 | BRM142 | BRM252 | BRM255 | BRM253 | BRM104 | BRM092 | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | Qty/unit (B) | Total Qty (A*B) | ||||
| 1 | Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge | 3.6844121152 | Cum | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 2 | Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. | 3.20405724672 | Cum | 1 | 3.20405724672 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 3 | Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. | 3.50005842048 | Cum | - | - | 2.29 | 8.0151337828992 | 0.48 | 1.6800280418304 | 0.96 | 3.3600560836608 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 4 | Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. | 6.7824392568 | Sqm | - | - | 0.0358 | 0.24281132539344 | 0.015 | 0.101736588852 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 5 | Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. | 14.8551897 | Sqm | - | - | 0.043 | 0.6387731571 | 0.018 | 0.2673934146 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 6 | Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. | 2.37426173952 | Cum | - | - | 3.23 | 7.6688654186496 | 0.45 | 1.068417782784 | - | - | 0.9 | 2.136835565568 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 7 | Plastering (AR1017) :.20mm thick cement Plaster in CM (1:4) over masonry work in inside. - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. | 17.2423880268 | Sqm | - | - | 0.0744 | 1.2828336691939 | 0.021 | 0.3620901485628 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 8 | Other Building Items. (AR1901Bb) :.Vitrified Tile 600mmx600mm industrial floor Tile - Supplying, fitting & fixing Vitrified industrial floor Tile of premium grade having thickness 8mm to 10mm confirming to IS 4457 of size 300mmx300mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all work all materials, taxes, labor, T&P , etc. complete as per direction of Engineer-in-charge. | 13.00642 | Sqm | - | - | 0.1074 | 1.396889508 | 0.021 | 0.27313482 | - | - | - | - | 1 | 13.00642 | 0.0076 | 0.098848792 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 9 | Painting(AR0903) :.Painting two coats of enamel paint in inner surface paint (Inner surface) - Painting two coats of enamel paint in inner surface paint including all costs of labour, Paint, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Inside) | 21.553496 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.125 | 2.694187 | - | - | - | - | - | - | - | - | - | - | - | - |
| 10 | Painting(AR0922ak) :.Finishing wall two coats with distemper of approved shades with one coat oilbound Primer on new work (Inside)(For repair and maintenance). - Finishing wall two coats with distemper of approved shades with one coat oil bound Primer on new work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For repair and maintenance). | 113.713272 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.25 | 28.428318 | 0.084 | 9.551914848 | - | - | - | - | - | - | - | - |
| 11 | Painting(AR0917h) :.Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work (Outside) - Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) | 114.1317814344 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.075 | 8.55988360758 | 0.090322580645161 | 10.308677032785 | - | - | - | - |
| 12 | R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc | 11.00157326 | Sqm | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | 0.00267 | 0.0293742006042 | 0.000614 | 0.00675496598164 |
| Total Qty | 3.20405724672 | 19.245306861236 | 3.7528007966292 | 3.3600560836608 | 2.136835565568 | 13.00642 | 0.098848792 | 2.694187 | 28.428318 | 9.551914848 | 8.55988360758 | 10.308677032785 | 0.0293742006042 | 0.00675496598164 | |||||||||||||||||
| Rate Per Unit | 152.5 | 0 | 152.5 | 259.5 | 259.5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||
| Total Amount | 488.6187301248 | 0 | 572.30212148595 | 871.93455370998 | 554.5088292649 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||
| S/N | Item Name | Amount (in Rs.) |
|---|---|---|
| 1 | Provision for PH Work @ Rs. 500 | Rs. 500 |
| 2 | Provision for EI Work @ Rs. 1000 | Rs. 1000 |
| 3 | Provision for Contingency @ Rs. 1042 | Rs. 1042 |
| 4 | Display Citizen Board @ Rs. 300 | Rs. 300 |
| 5 | Any Other Lumpsum @ Rs. 67.05 | Rs. 67.05 |
| Sl.No. | Item Name | Amount (in Rs.) | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| No data to display. | |||||||||||||||||||