State: Odisha District: Ganjam Block: Hinjilicut Gram Panchayat: Pattiapadar
Work Code: OD/354/3374/117776/412234/00041055 (REPAIR AND MANTAINANCE OF TOILET & DRINKING WATER KITCHEN OF AWC-! PUTIAPADAR)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Hinjilicut Proposal Date: 20-07-2024
Date of Commencement: 25-07-2025 Date of Completion: 17-09-2025
Scheme Name: Asset Management Women and Child Development Department Scheme Component Name: Self/Personal Deposit
Project Sub-Category: AWC Project Type: Repair and Maintenance
Name of Executant: SARMISTA PANDA
Administrative Approval Details
Approval No.: OD/354/3374/117776/412234/00041055/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3374/117776/412234/00041055/TS
Fund Sanction No.: 6584
Fund Sanction Amount (in Rs.): 45000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Semi-Skilled Skilled Highly-Skilled
462 512 562 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Other Building Items. (AR1907) : aluminum sliding window (sliding type) - Supplying, fitting, fixing up window (sliding type) made up aluminum Section 9778,as windows frame, section No. 4095,4096 and 9777, 3994 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T&P etc. complete as per direction of Engineer-incharge. 5.016762 Square Meter 1.006711409396 5.0504315436242 1.006711409396 5.0504315436242 0.33557046979866 1.6834771812081 0.33557046979866 1.6834771812081
2 Painting (AR0918cb) : Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 51.654068 Square Meter 0.11776344086022 6.0829607821075 - - - - 0.10776344086022 5.5664201021075
3 Painting (AR0903b) : Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. 12.263196 Square Meter 0.17204301075269 2.1097971612903 - - - - 0.18817204301075 2.3075906451613
Total Qty 13.243189487022 5.0504315436242 1.6834771812081 9.5574879284769
Rate Per Man Day 462 512 562 612
Total Amount 6118.3535430042 2585.8209503356 946.11417583893 5849.1826122278
Total Labour Amount (in Rs.): 15499.471281407