State: Odisha District: Ganjam Block: Kukudakhandi Gram Panchayat: Baulajholi
Work Code: OD/354/3378/117859/412557/00058595 (INFRASTRUCTURE DEVELOPMENT OF KALYAN MANDAP AT SATAPAHANDIA)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Kukudakhandi Proposal Date: -
Date of Commencement: 04-04-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Kalyan Mandap Project Type: New Work
Name of Executant: BHIBHUTI BHUSAN PRADHAN
Administrative Approval Details
Approval No.: OD/354/3378/117859/412557/00058595/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3378/117859/412557/00058595/TS
Fund Sanction No.: 1313
Fund Sanction Amount (in Rs.): 200000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM104 BRM092 BRM340 BRM028 BRM056 BRM137 BRM141 BRM255 BRM252 BRMMR0025 BRM006 BRM140 BRM044 BRMMR0038
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 10.8 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 1.8 Cum 1 1.8 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 54 Sqm - - 0.00267 0.14418 0.126 6.804 - - - - - - - - - - - - - - - - - - - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 8.7 Cum - - - - - - 3.23 28.101 0.45 3.915 0.9 7.83 - - - - - - - - - - - - - - - - - -
5 Painting(AR0903b) :.Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. 16.56 Sqm - - - - - - - - - - - - 0.054 0.89424 0.125 2.07 - - - - - - - - - - - - - -
6 Painting(AR0918ca) :.Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 135.675 Sqm - - - - - - - - - - - - - - - - 0.125 16.959375 0.084 11.3967 - - - - - - - - - -
7 Masonry Brick Work (AR0603ci) :.First floor - Brickwork with Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 0.2898 Cum - - - - - - 0.672 0.1947456 0.28 0.081144 - - - - - - - - - - 1 0.2898 400 115.92 - - - - - -
8 Plastering (AR1004) :.First Floor - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 2.042 Sqm - - - - - - 0.0358 0.0731036 0.015 0.03063 - - - - - - - - - - - - - - - - - - - -
9 Plastering (AR1014) :.First Floor - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 2.042 Sqm - - - - - - 0.043 0.087806 0.018 0.036756 - - - - - - - - - - - - - - - - - - - -
10 Painting(AR0920a) :.Finishing wall surface with two coats with plastic emulsion paint of approved shades above one coat oil bound Primer on new work (Inside) - Finishing wall surface with two coats with plastic emulsion paint of approved shades above one coat oil bound Primer on new work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 210.725 Sqm - - - - - - - - - - - - - - - - - - 0.084 17.7009 - - - - 0.125 26.340625 - - - -
11 Plastering (AR1008) :.20mm thick cement Plaster in CM (1:6) over brick work in inside. - 20mm thick cement Plaster in CM (1:6) for stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 20.895 Sqm - - - - - - 0.057 1.191015 0.021 0.438795 - - - - - - - - - - - - - - - - - - - -
12 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 3.51 Cum - - - - - - 2.29 8.0379 0.48 1.6848 - - - - - - - - - - - - - - - - 0.96 3.3696 - -
13 Other Building Items. (AR1902) :.cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 204.3375 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.8 163.47
Total Qty 1.8 0.14418 6.804 37.6855702 6.187125 7.83 0.89424 2.07 16.959375 29.0976 0.2898 115.92 26.340625 3.3696 163.47
Rate Per Unit 534.17 58573.086 229.106 591.182 537.54 1737.73 142.94787 205.58787 195.03787 125.74787 33 4.55488 249.58787 1336.36 30
Total Amount 961.506 8445.06753948 1558.837224 22279.030761976 3325.8271725 13606.4259 127.8297032688 425.5668909 3307.7203765313 3658.961222112 9.5634 528.0016896 6574.3004882187 4502.998656 4904.1
Total Material Amount (in Rs.): 74215.737024587