State: Odisha District: Khordha Block: Bhubaneswar Gram Panchayat: Nanput
Work Code: OD/362/3460/119610/407781/00050797 (MAINTENANCE OF NANPUT MARKET COMPLEX)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Bhubaneswar Proposal Date: -
Date of Commencement: 09-04-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Market Complex Project Type: Repair and Maintenance
Name of Executant: MADHUSMITA DHAL
Administrative Approval Details
Approval No.: OD/362/3460/119610/407781/00050797/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3460/119610/407781/00050797/TS
Fund Sanction No.: 1313
Fund Sanction Amount (in Rs.): 450000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092 BRM005 BRMMR0025 BRM131 BRMMR0027 BRM134 BRM064 BRM141 BRM174 BRM255 BRM253 BRM142 BRMM287 BRM140
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 2.24269056 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 30.55949056 Cum 1 30.55949056 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 2.24269056 Cum - - 2.29 5.1357613824 0.48 1.0764914688 0.96 2.1529829376 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 2.24269056 Cum - - 3.23 7.2438905088 0.45 1.009210752 - - 0.9 2.018421504 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 2.4526392 Sqm - - - - - - - - - - 0.00267 0.006548546664 0.126 0.3090325392 - - - - - - - - - - - - - - - - - - - - - - - - - -
6 Masonry Brick Work (AR0603b) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 0.094011776 Cum - - 0.672 0.063175913472 0.28 0.02632329728 - - - - - - - - 350 32.9041216 - - - - - - - - - - - - - - - - - - - - - - - -
7 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 5.734718336 Cum - - 0.672 3.853730721792 0.28 1.60572113408 - - - - - - - - 350 2007.1514176 1 5.734718336 - - - - - - - - - - - - - - - - - - - - - -
8 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 31.58702 Sqm - - 0.0358 1.130815316 0.015 0.4738053 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
9 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 13.00642 Sqm - - 0.043 0.55927606 0.018 0.23411556 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
10 Flooring (AR0817aa) :.Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. 18.5806 Sqm - - 0.1375 2.5548325 0.015 0.278709 - - - - - - - - - - - - 1 18.5806 1 18.5806 - - - - - - - - - - - - - - - - - -
11 Flooring (AR0816j) :.Fixing Chequred Tiles in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 - Fixing Chequred Tiles in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the Chequred tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. 9.2903 Sqm - - 0.2737 2.54275511 0.013 0.1207739 - - - - - - - - - - - - - - 1 9.2903 1 9.2903 - - - - - - - - - - - - - - - -
12 Concrete (AR0317) :.2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) 46.4515 Sqm - - 0.1208 5.6113412 0.0169 0.78503035 - - - - - - - - - - - - - - - - - - 0.0169 0.78503035 - - - - - - - - - - - - - -
13 Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 59.45792 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 7.43224 - - - - - - - - - - - -
14 Other Building Items. (AR1901B) :.Vitrified Tile 600mmx600mm Plain Ivory - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) 69.67725 Sqm - - 0.1074 7.48333665 0.021 1.46322225 - - - - - - - - - - - - 1 69.67725 - - - - - - - - 0.0076 0.5295471 - - - - - - - - - -
15 Painting(AR0918hk) :.Finishing wall with two coats weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work(Outside)(For repair and maintenance). - Finishing wall with two coats weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 174.750543 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 21.843817875 0.090322580645161 15.783920012903 - - - - - -
16 Painting(AR0918Ai) :.Finishing wall one coat with weather coat - Finishing wall one coat with weather coat including all costs of labour, Paint, Primer and Brushes required for the work etc. complete and as per direction of Engineer-in-charge. 91.323649 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.075 6.849273675 - - - - - - - -
17 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 280.845769 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 23.591044596 - - - - - -
18 Painting(AR0922) :.Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 185.806 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.25 46.4515 - - - -
19 miscellaneous(ARM287) :.Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC - Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP-63:2018. (New miscellaneous items) and as directed by Engineer-in-Charge. 74.3224 Sqm 0.03 2.229672 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 74.3224 - -
20 Painting(AR0920) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 185.806 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 23.22575
Total Qty 32.78916256 36.178915362464 7.07340301216 2.1529829376 2.018421504 0.006548546664 0.3090325392 2040.0555392 5.734718336 88.25785 27.8709 9.2903 0.78503035 7.43224 0.5295471 28.69309155 39.374964608903 46.4515 74.3224 23.22575
Rate Per Unit 397.3 569.387 403.69 1792.06 2169.52 58573.086 229.106 6.30115 33 660.6811111 8.5 212.91 1632.92 205.58787 2041.967 193.07787 154.51787 70.34787 608.4 249.58787
Total Amount 13027.134285088 20599.804081487 2855.4620619789 3858.2746031555 4379.0058213581 383.56858692549 70.801208925955 12854.69596083 189.245705088 58310.294401297 236.90265 1977.997773 1281.891759122 1527.9783909288 1081.3177031457 5540.001000189 6084.1356626931 3267.764083305 45217.74816 5796.8654716525
Total Material Amount (in Rs.): 188540.88937017