| State: Odisha |
District: Balangir |
Block: Balangir |
Gram Panchayat: Chikalbahal |
Work Code: OD/345/3285/115784/420279/00038855 (Improvement of Primary School Building at Bandhkeda)
Project Category: Building
| Financial Year: 2025-26 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Balangir |
Proposal Date: - |
| Date of Commencement: 10-04-2026 |
Date of Completion: - |
| Scheme Name: 5th SFC Grant in Aid |
Scheme Component Name: Maintenance of Primary School Building |
| Project Sub-Category: Elementary School |
Project Type: Upgradation or Improvement |
| Name of Executant: Jyotranjan Mohanty |
|
Administrative Approval Details
Approval No.: OD/345/3285/115784/420279/00038855/AS
Technical Sanction Details
Technical Sanction No.: OD/345/3285/115784/420279/00038855/TS
Fund Sanction No.: 34989
Fund Sanction Amount (in Rs.): 200000
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM174 |
BRM340 |
BRM028 |
BRM131 |
BRM143 |
BRM142 |
BRM252 |
BRM064 |
BRM045 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Other Building Items. (AR1901B) :.Vitrified Tile 600mmx600mm Plain Ivory - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) |
46.823112 |
Sqm |
0.0076 |
0.3558556512 |
0.1074 |
5.0288022288 |
0.021 |
0.983285352 |
1 |
46.823112 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Painting(AR0918c) :.Finishing wall with two coat water proofing cement paint including one coat cement wash on the outer surface of approved shade on new work (Outside) - Finishing wall with two coat water proofing cement paint including one coat cement wash on the outer surface of approved shade on new work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) |
64.63726225 |
Sqm |
- |
- |
0.010763440860215 |
0.69571934959409 |
- |
- |
- |
- |
0.25 |
16.1593155625 |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Painting(AR0921a) :.Finishing wall surface with One Coat with distemper of approved shades above one coat oilbound Primer on old work (Inside) - Finishing wall surface with One Coat with distemper of approved shades above one coat oilbound Primer on old work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) |
115.91971825 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.166 |
19.2426732295 |
0.084 |
9.737256333 |
- |
- |
- |
- |
| 4 |
Concrete (AR0317) :.2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) |
114.456496 |
Sqm |
- |
- |
0.1208 |
13.8263447168 |
0.0169 |
1.9343147824 |
- |
- |
- |
- |
- |
- |
- |
- |
0.0169 |
1.9343147824 |
- |
- |
| 5 |
Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
3.5679168 |
Cum |
- |
- |
2.29 |
8.170529472 |
0.48 |
1.712600064 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.96 |
3.425200128 |
| Total Qty |
0.3558556512 |
27.721395767194 |
4.6302001984 |
46.823112 |
16.1593155625 |
19.2426732295 |
9.737256333 |
1.9343147824 |
3.425200128 |
| Rate Per Unit |
2059.802 |
546.802 |
587.25 |
665.5902781 |
48.25622 |
70.52622 |
125.92622 |
1412.65 |
1349.81 |
| Total Amount |
732.99218205306 |
15158.114648293 |
2719.0850665104 |
31165.008137587 |
779.78748683342 |
1357.1130055718 |
1226.1758831858 |
2732.5097773574 |
4623.3693847757 |
Total Material Amount (in Rs.): 60494.155572168