State: Odisha District: Sambalpur Block: Kuchinda Gram Panchayat: Telitileimal
Work Code: OD/371/3562/121365/381575/00022880 (Const of Market Complex at Kaputikira, Telitileimal GP)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Kuchinda Proposal Date: -
Date of Commencement: 20-03-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Creation of Capital Asset for Revenue Generation
Project Sub-Category: Market Complex Project Type: New Work
Name of Executant: Prakash Kumar Ping
Administrative Approval Details
Approval No.: OD/371/3562/121365/381575/00022880/AS
Technical Sanction Details
Technical Sanction No.: OD/371/3562/121365/381575/00022880/TS
Fund Sanction No.: 32
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM006 BRMMR0025 BRM060 BRM052 BRM162 BRM341 BRM104 BRM092 BRM084 BRM094 BRM131 BRMMR0027 BRM174 BRMMR0038 BRM253
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 39.345 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 52.590475 Cum 1 52.590475 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 12.11392 Cum - - 2.29 27.7408768 0.48 5.8146816 0.96 11.6293632 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Masonry Brick Work (AR0603c) :.Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 35.621944 Cum - - 0.672 23.937946368 0.28 9.97414432 - - 400 14248.7776 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 Masonry Brick Work (AR0603ci) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 20.29152 Cum - - 0.672 13.63590144 0.28 5.6816256 - - 400 8116.608 1 20.29152 - - - - - - - - - - - - - - - - - - - - - - - - - -
6 R.C.C. Work (AR0404B) :.Reinforced cement concrete work of M-20 grade with 20mm & downgrade size black hard crusher broken granite chips.(Nominal mix as per IS-456, Table-9). - R.C.C. work of M-20 grade with 20mm & downgrade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge(Nominal mix as per IS-456, Table-9). 24.050393 Cum - - 3.4733 83.5342300069 0.45 10.82267685 - - - - - - 0.36 8.65814148 0.54 12.98721222 - - - - - - - - - - - - - - - - - - - - - -
7 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 22.8475 Qntl - - - - - - - - - - - - - - - - 0.8 18.278 1.05 23.989875 - - - - - - - - - - - - - - - - - -
8 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 43.45702 Sqm - - - - - - - - - - - - - - - - - - - - 0.00267 0.1160302434 0.126 5.47558452 - - - - - - - - - - - - - -
9 R.C.C. Work (AR0410d) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 26.54614 Sqm - - - - - - - - - - - - - - - - - - - - 0.0051904761904762 0.13778710761905 - - 0.55238095238095 14.663582095238 - - - - - - - - - - - -
10 R.C.C. Work (AR0410e) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. Lintels Data for 7.8 sqm 20.0733 Sqm - - - - - - - - - - - - - - - - - - - - 0.0052948717948718 0.10628555 - - - - 0.26923076923077 5.40435 - - - - - - - - - -
11 R.C.C. Work (AR0410a) :.Centring & Shuttering for R.C.C. floor and roof slabs, landings,balconies, projecting sun shades and chajjas - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height 99.3273 Sqm - - - - - - - - - - - - - - - - - - - - 0.0050222222222222 0.49884377333333 - - 0.62222222222222 61.803653333333 - - - - - - - - - - - -
12 Flooring (AR0817aa) :.Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. 9.765 Sqm - - 0.1375 1.3426875 0.015 0.146475 - - - - - - - - - - - - - - - - - - - - - - 1 9.765 1 9.765 - - - - - -
13 Other Building Items. (AR1901B) :.Vitrified Tile 600mmx600mm Plain Ivory - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) 54.3935 Sqm - - 0.1074 5.8418619 0.021 1.1422635 - - - - - - - - - - - - - - - - - - - - - - 1 54.3935 - - 0.0076 0.4133906 - - - -
14 Other Building Items. (AR1902) :.cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 201.7185 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.8 161.3748 - -
15 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 128.755 Sqm - - 0.0358 4.609429 0.015 1.931325 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
16 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 118.833 Sqm - - 0.043 5.109819 0.018 2.138994 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
17 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 201.7185 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 16.944354
18 Painting(AR0901di) :.Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces(outer surface ) - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 128.755 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.090322580645161 11.629483870968
Total Qty 52.590475 165.7527520149 37.65218587 11.6293632 22365.3856 20.29152 8.65814148 12.98721222 18.278 23.989875 0.85894667435238 5.47558452 76.467235428571 5.40435 64.1585 9.765 0.4133906 161.3748 28.573837870968
Rate Per Unit 411.11 566.787 417.99 1486.41 5.36398 33 1955.08 1918.7 90 6429.527 58573.086 229.106 250.166 240.106 659.6011111 8.5 2024.787 30 159.27787
Total Amount 21620.47017725 93946.505056269 15738.237171801 17286.001754112 119967.48105069 669.62016 16927.359244718 24918.564086514 1645.02 154243.54903913 50311.157426256 1254.4892670391 19129.502418224 1297.6168611 42319.017886509 83.0025 837.0279128022 4841.244 4551.1800338131
Total Material Amount (in Rs.): 591587.04604622