State: Odisha District: Kandhamal Block: Tumudibandh Gram Panchayat: Belaghar
Work Code: OD/359/3433/119010/417077/00049620 (CONST. OF CC ROAD FROM RANGAPARU SCHOOL TO GIRISAKSA VILLAGE)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Tumudibandh Proposal Date: -
Date of Commencement: 21-03-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: Pranya Kumar Mishra
Administrative Approval Details
Approval No.: OD/359/3433/119010/417077/00049620/AS
Technical Sanction Details
Technical Sanction No.: OD/359/3433/119010/417077/00049620/TS
Fund Sanction No.: 32004
Fund Sanction Amount (in Rs.): 500000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM045 BRM056 BRM060 BRM052 BRM162 BRM341 BRM104 BRM092 BRM084
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 21.786238 Cum - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 11.39963576 Cum 1 11.39963576 - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 57.97935592 Cum - - 2.29 132.7727250568 0.48 27.8300908416 0.96 55.6601816832 - - - - - - - - - - - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 10.7462256 Cum - - 3.23 34.710308688 0.45 4.83580152 - - 0.9 9.67160304 - - - - - - - - - - - - - -
5 R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 4.24752 Cum - - 3.4733 14.752911216 0.45 1.911384 - - - - 0.36 1.5291072 0.54 2.2936608 - - - - - - - - - -
6 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 4.25 Qntl - - - - - - - - - - - - - - 0.8 3.4 1.05 4.4625 - - - - - -
7 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 94.76106 Sqm - - - - - - - - - - - - - - - - - - 0.00267 0.2530120302 0.126 11.93989356 - -
8 R.C.C. Work (AR0410a) :.Centring & Shuttering for R.C.C. floor and roof slabs, landings,balconies, projecting sun shades and chajjas - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height 13.00642 Sqm - - - - - - - - - - - - - - - - - - 0.0050222222222222 0.065321131555556 - - 0.62222222222222 8.0928835555556
Total Qty 11.39963576 182.2359449608 34.5772763616 55.6601816832 9.67160304 1.5291072 2.2936608 3.4 4.4625 0.31833316175556 11.93989356 8.0928835555556
Rate Per Unit 671.51 632.632 743.49 1128.47 1998.13 2020.18 1983.8 90.1 7133.412 58573.086 229.106 250.166
Total Amount 7654.9694091976 115288.29033244 25707.859202086 62810.845224041 19325.120182315 3089.071783296 4550.16429504 306.34 31832.85105 18645.75566016 2735.5012539574 2024.5643075591
Total Material Amount (in Rs.): 293971.33270009