State: Odisha District: Bargarh Block: Paikmal Gram Panchayat: Mithapalli
Work Code: OD/347/3320/116550/379769/00040341 (Repair & Maintenance of UGHS School Dunguripali)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Paikmal Proposal Date: -
Date of Commencement: 08-04-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Primary School Building
Project Sub-Category: Elementary School Project Type: Repair and Maintenance
Name of Executant: Bishok Kumar Patel
Administrative Approval Details
Approval No.: OD/347/3320/116550/379769/00040341/AS
Technical Sanction Details
Technical Sanction No.: OD/347/3320/116550/379769/00040341/TS
Fund Sanction No.: 27871
Fund Sanction Amount (in Rs.): 500000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM060 BRM052 BRM084 BRM104 BRM094 BRM162 BRM341
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 3.928956 Cum 3.4733 13.6464428748 0.45 1.7680302 0.36 1.41442416 0.54 2.12163624 4.4196 17.3644139376 0.041529 0.163165613724 - - - - - -
2 R.C.C. Work (AR0404Ae) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Stairs excluding landing but including railing) 2.036544256 Cum 3.4733 7.0735291643648 0.45 0.9164449152 0.36 0.73315593216 0.54 1.09973389824 - - 0.04806 0.09787631694336 1.17 2.38275677952 - - - -
3 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 14.13574656 Cum 3.4733 49.097688526848 0.45 6.361085952 0.36 5.0888687616 0.54 7.6333031424 6.2216 87.946960797696 0.0502172 0.70985761215283 - - - - - -
4 Plastering (AR1017) :.First Floor - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 111.4836 Sqm 0.0744 8.29437984 0.021 2.3411556 - - - - - - - - - - - - - -
5 R.C.C. Work (AR0409) :.First floor - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 22.5 Qntl - - - - - - - - - - - - - - 0.8 18 1.05 23.625
Total Qty 78.112040406013 11.3867166672 7.23644885376 10.85467328064 105.3113747353 0.97089954282019 2.38275677952 18 23.625
Rate Per Unit 631.067 539.24 1946.06 1877.95 440.406 58763.326 430.346 90.1 6390.377
Total Amount 49293.931002901 6140.1730956209 14082.563656348 20384.533687378 46379.761301673 57053.286347994 1025.4098490393 1621.8 150972.656625
Total Material Amount (in Rs.): 346954.11556595