State: Odisha District: Cuttack Block: Cuttacksadar Gram Panchayat: Arilo
Work Code: OD/350/3337/116952/399957/00038442 (Maintenance of Arilo UP School ,Arilo)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Cuttacksadar Proposal Date: -
Date of Commencement: - Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Primary School Building
Project Sub-Category: Elementary School Project Type: Repair and Maintenance
Name of Executant:
Administrative Approval Details
Approval No.:
Technical Sanction Details
Technical Sanction No.:
Fund Sanction No.: 1198
Fund Sanction Amount (in Rs.): 104180
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM133 BRM174 BRM141 BRM142 BRM252 BRM255 BRM253 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 3.6844121152 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 3.20405724672 Cum 1 3.20405724672 - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 3.50005842048 Cum - - 2.29 8.0151337828992 0.48 1.6800280418304 0.96 3.3600560836608 - - - - - - - - - - - - - - - - - - - -
4 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 6.7824392568 Sqm - - 0.0358 0.24281132539344 0.015 0.101736588852 - - - - - - - - - - - - - - - - - - - - - -
5 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 14.8551897 Sqm - - 0.043 0.6387731571 0.018 0.2673934146 - - - - - - - - - - - - - - - - - - - - - -
6 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 2.37426173952 Cum - - 3.23 7.6688654186496 0.45 1.068417782784 - - 0.9 2.136835565568 - - - - - - - - - - - - - - - - - -
7 Plastering (AR1017) :.20mm thick cement Plaster in CM (1:4) over masonry work in inside. - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 17.2423880268 Sqm - - 0.0744 1.2828336691939 0.021 0.3620901485628 - - - - - - - - - - - - - - - - - - - - - -
8 Other Building Items. (AR1901Bb) :.Vitrified Tile 600mmx600mm industrial floor Tile - Supplying, fitting & fixing Vitrified industrial floor Tile of premium grade having thickness 8mm to 10mm confirming to IS 4457 of size 300mmx300mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all work all materials, taxes, labor, T&P , etc. complete as per direction of Engineer-in-charge. 13.00642 Sqm - - 0.1074 1.396889508 0.021 0.27313482 - - - - 1 13.00642 0.0076 0.098848792 - - - - - - - - - - - - - -
9 Painting(AR0903) :.Painting two coats of enamel paint in inner surface paint (Inner surface) - Painting two coats of enamel paint in inner surface paint including all costs of labour, Paint, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Inside) 21.553496 Sqm - - - - - - - - - - - - - - 0.125 2.694187 - - - - - - - - - - - -
10 Painting(AR0922ak) :.Finishing wall two coats with distemper of approved shades with one coat oilbound Primer on new work (Inside)(For repair and maintenance). - Finishing wall two coats with distemper of approved shades with one coat oil bound Primer on new work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)(For repair and maintenance). 113.713272 Sqm - - - - - - - - - - - - - - - - 0.25 28.428318 0.084 9.551914848 - - - - - - - -
11 Painting(AR0917h) :.Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work (Outside) - Finishing wall with one coat weather coat paint of approved shade including one coat of water bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) 114.1317814344 Sqm - - - - - - - - - - - - - - - - - - - - 0.075 8.55988360758 0.090322580645161 10.308677032785 - - - -
12 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 11.00157326 Sqm - - - - - - - - - - - - - - - - - - - - - - - - 0.00267 0.0293742006042 0.126 1.38619823076
Total Qty 3.20405724672 19.245306861236 3.7528007966292 3.3600560836608 2.136835565568 13.00642 0.098848792 2.694187 28.428318 9.551914848 8.55988360758 10.308677032785 0.0293742006042 1.38619823076
Rate Per Unit 413.05 563.767 417.99 2167.11 2595.71 587.9511111 2041.967 203.74787 70.24787 125.74787 195.03787 159.27787 58573.086 229.106
Total Amount 1323.4358457577 10849.868913239 1568.633204983 7281.6111394622 5546.6054459005 7647.1390904333 201.84597125386 548.93486263169 1997.0287871827 1201.1329465574 1669.5014662703 1641.9441202998 1720.5375781711 317.5863318565
Total Material Amount (in Rs.): 43515.805703998