State: Odisha District: Khordha Block: Balipatna Gram Panchayat: Alisisasan
Work Code: OD/362/3457/275278/407671/00089113 (Repair and Maintenance of Bhairpur Govt Pry. School, Bhairpur)
Project Category: Building
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Balipatna Proposal Date: -
Date of Commencement: 17-03-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Primary School Building
Project Sub-Category: Elementary School Project Type: Repair and Maintenance
Name of Executant: Sushree
Administrative Approval Details
Approval No.: OD/362/3457/275278/407671/00089113/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3457/275278/407671/00089113/TS
Fund Sanction No.: 22574
Fund Sanction Amount (in Rs.): 250000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Highly-Skilled Semi-Skilled
462 562 612 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Masonry Brick Work (AR0603bi) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 7.62024 Cubic Meter 2.96 22.5559104 - - 1.05 8.001252 0.35 2.667084
2 Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 53.985492 Square Meter 0.24 12.95651808 - - 0.16 8.63767872 - -
3 Plastering (AR1027) : 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 47.2894 Square Meter 0.17 8.039198 - - 0.14 6.620516 - -
4 Other Building Items. (AR1901Ba) : Vitrified Tile 600mmx600mm Coloured /Printed - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Coloured /Printed series(Homogeneous) in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all work all materials, taxes, labor, T&P , etc. complete as per direction of Engineer-in-charge. 27.813 Square Meter 0.216 6.007608 - - - - 0.216 6.007608
5 Flooring (AR0817a) : Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge 9.0885 Square Meter 0.325 2.9537625 0.76 6.90726 - - 0.325 2.9537625
6 Flooring (AR0817ap) : Fixing Chequred Tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Chequred Tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Chequred tiles including rubbing and polishing complete including cost of precast tiles. 54.67924 Square Meter 0.325 17.770753 0.76 41.5562224 - - 0.325 17.770753
7 Flooring (AR0817bck) : Fixing Vitrified industrial Tile of premium grade having thickness 8mm to 10mm confirming to IS 4457 of size 300mmx300mm in wall cladding/ glazed tiles on 12mm thick cement plaster (1:3)(For repair and maintenance) - Fixing Vitrified industrial Tile of premium grade having thickness 8mm to 10mm confirming to IS 4457 of size 300mmx300mm in wall cladding/ glazed tiles on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified industrial tiles including rubbing and polishing complete including cost of precast tiles(For repair and maintenance). 4.746 Square Meter 0.325 1.54245 - - - - 0.325 1.54245
8 Iron Work (AR1704) : Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 3.42 Quintal 6.3976377952756 21.879921259843 1.9685039370079 6.7322834645669 3.9370078740157 13.464566929134 3.4448818897638 11.781496062992
9 Plastering (AR1004) : 12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 33.7149 Square Meter 0.12 4.045788 - - 0.14 4.720086 - -
10 Painting (AR0901di) : Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces(outer surface ) - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 48.72022 Square Meter 0.053763440860215 2.6193666666667 - - - - 0.053763440860215 2.6193666666667
11 Painting (AR0918cb) : Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 33.7149 Square Meter 0.11776344086022 3.9703826322581 - - - - 0.10776344086022 3.6332336322581
12 Painting (AR0922) : Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 110.19698 Square Meter 0.062 6.83221276 - - - - 0.052 5.73024296
13 Painting (AR0903b) : Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. 18.01871 Square Meter 0.17204301075269 3.0999931182796 - - - - 0.18817204301075 3.3906174731183
Total Qty 114.27386441705 41.444099649134 58.096614295035 55.195765864567
Rate Per Man Day 462 562 612 512
Total Amount 52794.525360676 23291.584002813 35555.127948561 28260.232122658
Total Labour Amount (in Rs.): 139901.46943471