| State: Odisha |
District: Koraput |
Block: Narayan Patana |
Gram Panchayat: Borigi |
Work Code: OD/363/3477/119892/428668/00035244 (Repair and maintenanace of Dugam PS)
Project Category: Building
| Financial Year: 2025-26 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Narayan Patana |
Proposal Date: - |
| Date of Commencement: 23-02-2026 |
Date of Completion: - |
| Scheme Name: 5th SFC Grant in Aid |
Scheme Component Name: Maintenance of Primary School Building |
| Project Sub-Category: Elementary School |
Project Type: Repair and Maintenance |
| Name of Executant: Sravani Padhy |
|
Administrative Approval Details
Approval No.: OD/363/3477/119892/428668/00035244/AS
Technical Sanction Details
Technical Sanction No.: OD/363/3477/119892/428668/00035244/TS
Fund Sanction No.: 34989
Fund Sanction Amount (in Rs.): 200000
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Un-Skilled
|
Highly-Skilled
|
Skilled
|
| 462 |
612 |
562 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
Concrete (AR0317) : 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work)
|
122.89 |
Square Meter |
0.36 |
44.2404 |
- |
- |
0.1 |
12.289 |
| 2 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
1 |
Cubic Meter |
3.9 |
3.9 |
0.18 |
0.18 |
- |
- |
| 3 |
Painting (AR0901a) : Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge.
|
471.56 |
Square Meter |
0.053763440860215 |
25.352688172043 |
- |
- |
0.053763440860215 |
25.352688172043 |
| 4 |
Painting (AR0922) : Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside)
|
373.56 |
Square Meter |
0.062 |
23.16072 |
- |
- |
0.052 |
19.42512 |
| 6 |
Dismantling (AR1620) : Dismantling and removing 2.5 cm thick grading concrete from roof - Dismantling and removing 2.5 cm thick grading concrete from roof slab cleaning the surface lowering and removing the debris within 50m lead and as per direction of Engineer-in-Charge.
|
122.89 |
Square Meter |
0.24193548387097 |
29.731451612903 |
- |
- |
- |
- |
| Total Qty |
126.38525978495 |
57.066808172043 |
0.18 |
| Rate Per Man Day |
462 |
612 |
562 |
| Total Amount |
58389.990020645 |
34924.88660129 |
101.16 |
Total Labour Amount (in Rs.): 93416.036621935