State: Odisha District: Koraput Block: Pottangi Gram Panchayat: Pottangi
Work Code: OD/363/3478/119907/430025/00035589 (Completion of incomplete Kalyan Mandap, Pottangi)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Pottangi Proposal Date: -
Date of Commencement: 16-03-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Kalyan Mandap Project Type: Repair and Maintenance
Name of Executant: PRASANNA GARADA
Administrative Approval Details
Approval No.: OD/363/3478/119907/430025/00035589/AS
Technical Sanction Details
Technical Sanction No.: OD/363/3478/119907/430025/00035589/TS
Fund Sanction No.: 1313
Fund Sanction Amount (in Rs.): 350000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. Sqm 45 252.173784948 11347.82032266
2 Painting (AR0918cb) : Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) Sqm 312.396 160.8187295604 50239.127839751
3 Painting (AR0903i) : Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) Sqm 35.64 164.26504615202 5854.406244858
Total Amount (in Rs.): 67441.354407269
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Highly-Skilled
462 562 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Plastering (AR1014) : 16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 45 Square Meter 0.24 10.8 0.16 7.2 - -
2 Painting (AR0918cb) : Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 312.396 Square Meter 0.11776344086022 36.788827870968 - - 0.10776344086022 33.664867870968
3 Painting (AR0903i) : Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 35.64 Square Meter 0.11827956989247 4.2154838709677 - - 0.13440860215054 4.7903225806452
Total Qty 51.804311741935 7.2 38.455190451613
Rate Per Man Day 462 562 612
Total Amount 23933.592024774 4046.4 23534.576556387
Total Labour Amount (in Rs.): 51514.568581161
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM255 BRM253 BRM141
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 45 Sqm 0.043 1.935 0.018 0.81 - - - - - -
2 Painting(AR0918cb) :.Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 312.396 Sqm - - - - 0.125 39.0495 0.090322580645161 28.216412903226 - -
3 Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 35.64 Sqm - - - - - - - - 0.125 4.455
Total Qty 1.935 0.81 39.0495 28.216412903226 4.455
Rate Per Unit 571.157 1075.77 195.51347 159.75347 205.88347
Total Amount 1105.188795 871.3737 7634.703246765 4507.6698722431 917.21085885
Total Material Amount (in Rs.): 15036.146472858
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM255 BRM253 BRM141
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 45 Sqm 0.043 1.935 0.018 0.81 - - - - - -
2 Painting(AR0918cb) :.Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 312.396 Sqm - - - - 0.125 39.0495 0.090322580645161 28.216412903226 - -
3 Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 35.64 Sqm - - - - - - - - 0.125 4.455
Total Qty 1.935 0.81 39.0495 28.216412903226 4.455
Rate Per Unit 0 40.25 0 0 0
Total Amount 0 32.6025 0 0 0
Total Royalty Amount (in Rs.): 32.6025
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Provision for PH Work @ Rs. 109058 Rs. 109058
2 Provision for EI Work @ Rs. 149000 Rs. 149000
3 Provision for Contingency @ Rs. 3500 Rs. 3500
4 Display Citizen Board @ Rs. 5000 Rs. 5000
5 Any Other Lumpsum @ Rs. 16000 Rs. 16000
Total Addition Component Amount (in Rs.): 282558
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 349999.35440727