State: Odisha District: Koraput Block: Borigumma Gram Panchayat: B Andiguda
Work Code: OD/363/3468/275089/428266/00037624 (Provision of facilities at GP Headquarters at Bandiguda )
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Borigumma Proposal Date: -
Date of Commencement: 25-02-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Provision of Facilities at GP Head Quarter
Project Sub-Category: GP Bhawan Project Type: New Work
Name of Executant: GOKULA CHANDRA NAYAK
Administrative Approval Details
Approval No.: OD/363/3468/275089/428266/00037624/AS
Technical Sanction Details
Technical Sanction No.: OD/363/3468/275089/428266/00037624/TS
Fund Sanction No.: 33921
Fund Sanction Amount (in Rs.): 1000000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 R.C.C. Work (AR0404Ac) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) Cum 4.46315 15914.134629676 71027.169972438
2 R.C.C. Work (AR0404Ad) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) Cum 1.500405 14250.736692378 21381.876586927
3 R.C.C. Work (AR0404Ag) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) Cum 8.11881 13816.410394572 112172.81087556
4 R.C.C. Work (AR0404Af) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Sun sheds & Chajja) Sqm 6.15 8259.6663773132 50796.948220476
5 Concrete (AR0317) : First floor - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) Sqm 81.1881 389.2876934788 31605.528186926
6 Masonry Brick Work (AR0603ei) : First floor - Brickwork with C.B. Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. Cum 25.886155 5355.634220592 138636.77755755
7 R.C.C. Work (AR0409) : First floor - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. Qntl 14.5 8712.2164387 126327.13836115
8 Plastering (AR1004) : First Floor - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. Sqm 103.32 179.2963330988 18524.897135768
9 Plastering (AR1014) : First Floor - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. Sqm 188.7 256.645564998 48429.018115123
10 Flooring (AR0816) : First floor - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. Sqm 10.5 1225.4122070492 12866.828174017
11 Flooring (AR0817b) : First floor - Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) in wall cladding on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge. Sqm 23.5 904.447561956 21254.517705966
12 Flooring (AR0817aak) : First Floor - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados, skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles(For repair and maintenance). Sqm 60.878 1588.944155956 96731.742326289
13 Other Building Items. (AR1902) : First Floor - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. Sqm 256.662 80.8676902 20755.663102112
14 Painting (AR0901d) : First Floor - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. Sqm 359.982 73.597201188671 26493.6676783
15 Painting (AR0920) : First Floor - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) Sqm 359.98 96.672410075 34800.134178799
16 Other Building Items. (AR1907) : aluminum sliding window (sliding type) - Supplying, fitting, fixing up window (sliding type) made up aluminum Section 9778,as windows frame, section No. 4095,4096 and 9777, 3994 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T&P etc. complete as per direction of Engineer-incharge. Sqm 4.32 4152.7950064027 17940.07442766
17 miscellaneous (ARM291) : Supplying and fixing of Wall paneling made of aluminum anodised section framing conforming to standard Aluminium sections as horizontal and vertical members with atleast 600mm c/c and fixing of 9mm thick BWR ply with 4mm thick veneer pasting finished with - Supplying and fixing of Wall paneling made of aluminum anodised section framing conforming to standard Aluminium sections as horizontal and vertical members with atleast 600mm c/c and fixing of 9mm thick BWR ply with 4mm thick veneer pasting finished with melamine polishing complete. (New miscellaneous items) and as directed by Engineer-in-Charge. Sqm 4.5 2285.5 10284.75
Total Amount (in Rs.): 860029.54260506
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled Highly-Skilled
462 562 512 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0404Ac) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 4.46315 Cubic Meter 1.533295 6.84332557925 6.352395 28.35169174425 6.4015 28.570854725 - -
2 R.C.C. Work (AR0404Ad) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 1.500405 Cubic Meter 1.533295 2.300563484475 2.758395 4.138709649975 2.8075 4.2123870375 - -
3 R.C.C. Work (AR0404Ag) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 8.11881 Cubic Meter 1.533295 12.44853077895 3.732195 30.30098208795 3.7813 30.699656253 - -
4 R.C.C. Work (AR0404Af) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Sun sheds & Chajja) 6.15 Square Meter 0.0958309375 0.589360265625 3.6341184375 22.349828390625 3.6371875 22.368703125 - -
5 Concrete (AR0317) : First floor - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) 81.1881 Square Meter 0.414 33.6118734 - - - - 0.115 9.3366315
6 Masonry Brick Work (AR0603ei) : First floor - Brickwork with C.B. Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 25.886155 Cubic Meter 3.565 92.284142575 - - 1.2075 31.2575321625 0.4025 10.4191773875
7 R.C.C. Work (AR0409) : First floor - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 14.5 Quintal 0.84 12.18 0.0462 0.6699 - - 0.315 4.5675
8 Plastering (AR1004) : First Floor - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 103.32 Square Meter 0.1236 12.770352 - - 0.1442 14.898744 - -
9 Plastering (AR1014) : First Floor - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 188.7 Square Meter 0.2472 46.64664 - - 0.1648 31.09776 - -
10 Flooring (AR0816) : First floor - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. 10.5 Square Meter 0.2268 2.3814 0.5775 6.06375 - - 0.2268 2.3814
11 Flooring (AR0817b) : First floor - Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) in wall cladding on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge. 23.5 Square Meter 0.34125 8.019375 - - - - 0.34125 8.019375
12 Flooring (AR0817aak) : First Floor - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados, skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles(For repair and maintenance). 60.878 Square Meter 0.34775 21.1703245 0.8132 49.5059896 - - 0.34775 21.1703245
13 Other Building Items. (AR1902) : First Floor - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 256.662 Square Meter 0.05871 15.06862602 - - 0.0515 13.218093 - -
14 Painting (AR0901d) : First Floor - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 359.982 Square Meter 0.055376344086022 19.934487096774 - - - - 0.055376344086022 19.934487096774
15 Painting (AR0920) : First Floor - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 359.98 Square Meter 0.06592 23.7298816 - - - - 0.05562 20.0220876
16 Other Building Items. (AR1907) : aluminum sliding window (sliding type) - Supplying, fitting, fixing up window (sliding type) made up aluminum Section 9778,as windows frame, section No. 4095,4096 and 9777, 3994 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T&P etc. complete as per direction of Engineer-incharge. 4.32 Square Meter 1.006711409396 4.3489932885906 1.006711409396 4.3489932885906 0.33557046979866 1.4496644295302 0.33557046979866 1.4496644295302
Total Qty 314.32787558866 177.77339473253 145.72984476139 97.300647513804
Rate Per Man Day 462 562 512 612
Total Amount 145219.47852196 99908.647839682 74613.680517832 59547.996278448
Total Labour Amount (in Rs.): 379289.80315793
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM060 BRM052 BRM084 BRM104 BRM094 BRM064 BRMMR0025 BRM002 BRM162 BRM341 BRMMR0027 BRM130 BRM129 BRM131 BRMMR0038 BRM253 BRM140 BRMMR0005 BRM271 BRMMR0008 BRMMR0013 BRMMR0012 BRMMR0011 BRMMR0010 BRMMR0009 BRM304 BRMM291
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0404Ac) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 4.46315 Cum 3.4733 15.501858895 0.45 2.0084175 0.36 1.606734 0.54 2.410101 5.30352 23.670405288 0.0498348 0.22242018762 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 R.C.C. Work (AR0404Ad) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 1.500405 Cum 3.4733 5.2113566865 0.45 0.67518225 0.36 0.5401458 0.54 0.8102187 - - 0.0889602 0.133476328881 4.5234 6.786931977 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 R.C.C. Work (AR0404Ag) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 8.11881 Cum 3.4733 28.199062773 0.45 3.6534645 0.36 2.9227716 0.54 4.3841574 7.46592 60.6143859552 0.06026064 0.4892446866384 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 R.C.C. Work (AR0404Af) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Sun sheds & Chajja) 6.15 Sqm 0.21708125 1.3350496875 0.028125 0.17296875 0.0225 0.138375 0.03375 0.2075625 7.392 45.4608 0.059664 0.3669336 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 Concrete (AR0317) :.First floor - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) 81.1881 Sqm 0.1208 9.80752248 0.0169 1.37207889 - - - - - - - - - - 0.0169 1.37207889 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6 Masonry Brick Work (AR0603ei) :.First floor - Brickwork with C.B. Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 25.886155 Cum 0.672 17.39549616 0.28 7.2481234 - - - - - - - - - - - - 1 25.886155 400 10354.462 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
7 R.C.C. Work (AR0409) :.First floor - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 14.5 Qntl - - - - - - - - - - - - - - - - - - - - 0.8 11.6 1.05 15.225 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
8 Plastering (AR1004) :.First Floor - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 103.32 Sqm 0.0358 3.698856 0.015 1.5498 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
9 Plastering (AR1014) :.First Floor - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 188.7 Sqm 0.043 8.1141 0.018 3.3966 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
10 Flooring (AR0816) :.First floor - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. 10.5 Sqm 0.2737 2.87385 0.013 0.1365 - - - - - - - - - - - - - - - - - - - - 1 10.5 1 10.5 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
11 Flooring (AR0817b) :.First floor - Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) in wall cladding on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge. 23.5 Sqm 0.1375 3.23125 0.015 0.3525 - - - - - - - - - - - - - - - - - - - - - - - - 1 23.5 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
12 Flooring (AR0817aak) :.First Floor - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados, skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles(For repair and maintenance). 60.878 Sqm 0.1375 8.370725 0.015 0.91317 - - - - - - - - - - - - - - - - - - - - 1 60.878 - - - - 1 60.878 - - - - - - - - - - - - - - - - - - - - - - - - - -
13 Other Building Items. (AR1902) :.First Floor - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 256.662 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.8 205.3296 - - - - - - - - - - - - - - - - - - - - - - - -
14 Painting(AR0901d) :.First Floor - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 359.982 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 30.238488 - - - - - - - - - - - - - - - - - - - - - -
15 Painting(AR0920) :.First Floor - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 359.98 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 44.9975 - - - - - - - - - - - - - - - - - - - -
16 Other Building Items. (AR1907) :.aluminum sliding window (sliding type) - Supplying, fitting, fixing up window (sliding type) made up aluminum Section 9778,as windows frame, section No. 4095,4096 and 9777, 3994 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T&P etc. complete as per direction of Engineer-incharge. 4.32 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1.3422818791946 5.7986577181208 1.1006711409396 4.7548993288591 0.67114093959732 2.8993288590604 5.3691275167785 23.194630872483 5.0335570469799 21.744966442953 6.5436241610738 28.268456375839 0.67114093959732 2.8993288590604 5.3691275167785 23.194630872483 5.1330201342282 22.174646979866 - -
17 miscellaneous(ARM291) :.Supplying and fixing of Wall paneling made of aluminum anodised section framing conforming to standard Aluminium sections as horizontal and vertical members with atleast 600mm c/c and fixing of 9mm thick BWR ply with 4mm thick veneer pasting finished with - Supplying and fixing of Wall paneling made of aluminum anodised section framing conforming to standard Aluminium sections as horizontal and vertical members with atleast 600mm c/c and fixing of 9mm thick BWR ply with 4mm thick veneer pasting finished with melamine polishing complete. (New miscellaneous items) and as directed by Engineer-in-Charge. 4.5 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 4.5
Total Qty 103.739127682 21.47880529 5.2080264 7.8120396 129.7455912432 1.2120748031394 6.786931977 1.37207889 25.886155 10354.462 11.6 15.225 71.378 10.5 23.5 60.878 205.3296 30.238488 44.9975 5.7986577181208 4.7548993288591 2.8993288590604 23.194630872483 21.744966442953 28.268456375839 2.8993288590604 23.194630872483 22.174646979866 4.5
Rate Per Unit 588.992 742.47 1759.78 1723.4 392.846 58715.766 382.786 1191.31 33 4.84474 90.1 6422.452 8.5 464.5902781 419.7102781 665.5902781 30 159.45622 249.76622 40 705.01 100 25 10 15 30 1.5 297.97 2285.5
Total Amount 61101.516291677 15947.368563666 9164.980698192 13463.26904664 50970.036537526 71167.900515629 2597.9425437479 1634.5713024459 854.243115 50164.67622988 1045.16 97781.8317 606.713 4878.19792005 9863.19153535 40519.804950172 6159.888 4821.7149949954 11238.85548445 231.94630872483 3352.2515758389 289.93288590604 579.86577181208 217.44966442953 424.02684563758 86.979865771812 34.791946308725 6607.3795605906 10284.75
Total Material Amount (in Rs.): 476091.23685444
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM060 BRM052 BRM084 BRM104 BRM094 BRM064 BRM002 BRM341 BRM130 BRM129 BRM131 BRM253 BRM140
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0404Ac) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 4.46315 Cum 3.4733 15.501858895 0.45 2.0084175 0.36 1.606734 0.54 2.410101 0.0544068 0.24282570942 0.0498348 0.22242018762 - - - - - - - - - - - - - - - - - -
2 R.C.C. Work (AR0404Ad) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 1.500405 Cum 3.4733 5.2113566865 0.45 0.67518225 0.36 0.5401458 0.54 0.8102187 - - 0.0889602 0.133476328881 0.0594504 0.089199677412 - - - - - - - - - - - - - - - -
3 R.C.C. Work (AR0404Ag) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 8.11881 Cum 3.4733 28.199062773 0.45 3.6534645 0.36 2.9227716 0.54 4.3841574 0.0919908 0.746855826948 0.06026064 0.4892446866384 - - - - - - - - - - - - - - - - - -
4 R.C.C. Work (AR0404Af) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Sun sheds & Chajja) 6.15 Sqm 0.21708125 1.3350496875 0.028125 0.17296875 0.0225 0.138375 0.03375 0.2075625 0.09108 0.560142 0.059664 0.3669336 - - - - - - - - - - - - - - - - - -
5 Concrete (AR0317) :.First floor - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) 81.1881 Sqm 0.1208 9.80752248 0.0169 1.37207889 - - - - - - - - - - 0.0169 1.37207889 - - - - - - - - - - - - - -
6 Masonry Brick Work (AR0603ei) :.First floor - Brickwork with C.B. Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 25.886155 Cum 0.672 17.39549616 0.28 7.2481234 - - - - - - - - - - - - 400 10354.462 - - - - - - - - - - - -
7 R.C.C. Work (AR0409) :.First floor - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 14.5 Qntl - - - - - - - - - - - - - - - - - - 1.05 15.225 - - - - - - - - - -
8 Plastering (AR1004) :.First Floor - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 103.32 Sqm 0.0358 3.698856 0.015 1.5498 - - - - - - - - - - - - - - - - - - - - - - - - - -
9 Plastering (AR1014) :.First Floor - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 188.7 Sqm 0.043 8.1141 0.018 3.3966 - - - - - - - - - - - - - - - - - - - - - - - - - -
10 Flooring (AR0816) :.First floor - Fixing ceramic Tiles (30cmx30cm / 40cmx40cm special plain/printed series ceramic floor tiles of premium grade having thickness 7mm to 8mm confirming to IS 13755) in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. 10.5 Sqm 0.2737 2.87385 0.013 0.1365 - - - - - - - - - - - - - - - - 1 10.5 - - - - - - - -
11 Flooring (AR0817b) :.First floor - Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) in wall cladding on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge. 23.5 Sqm 0.1375 3.23125 0.015 0.3525 - - - - - - - - - - - - - - - - - - 1 23.5 - - - - - -
12 Flooring (AR0817aak) :.First Floor - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados, skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles(For repair and maintenance). 60.878 Sqm 0.1375 8.370725 0.015 0.91317 - - - - - - - - - - - - - - - - - - - - 1 60.878 - - - -
13 Other Building Items. (AR1902) :.First Floor - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 256.662 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
14 Painting(AR0901d) :.First Floor - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 359.982 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 30.238488 - -
15 Painting(AR0920) :.First Floor - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 359.98 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 44.9975
16 Other Building Items. (AR1907) :.aluminum sliding window (sliding type) - Supplying, fitting, fixing up window (sliding type) made up aluminum Section 9778,as windows frame, section No. 4095,4096 and 9777, 3994 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour, T&P etc. complete as per direction of Engineer-incharge. 4.32 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
17 miscellaneous(ARM291) :.Supplying and fixing of Wall paneling made of aluminum anodised section framing conforming to standard Aluminium sections as horizontal and vertical members with atleast 600mm c/c and fixing of 9mm thick BWR ply with 4mm thick veneer pasting finished with - Supplying and fixing of Wall paneling made of aluminum anodised section framing conforming to standard Aluminium sections as horizontal and vertical members with atleast 600mm c/c and fixing of 9mm thick BWR ply with 4mm thick veneer pasting finished with melamine polishing complete. (New miscellaneous items) and as directed by Engineer-in-Charge. 4.5 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Total Qty 103.739127682 21.47880529 5.2080264 7.8120396 1.549823536368 1.2120748031394 0.089199677412 1.37207889 10354.462 15.225 10.5 23.5 60.878 30.238488 44.9975
Rate Per Unit 0 242.25 235.5 235.5 0 0 0 235.5 0.05531 0 0 0 0 0 0
Total Amount 0 5203.2405815025 1226.4902172 1839.7353258 0 0 0 323.124578595 572.70529322 0 0 0 0 0 0
Total Royalty Amount (in Rs.): 9165.2959963175
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Provision for PH Work @ Rs. 48000 Rs. 48000
2 Provision for EI Work @ Rs. 60000 Rs. 60000
3 Provision for Contingency @ 1% Rs. 8600.2954260506
4 Display Citizen Board @ Rs. 2000 Rs. 2000
5 Any Other Lumpsum @ Rs. 21370 Rs. 21370
Total Addition Component Amount (in Rs.): 139970.29542605
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 999999.83803111