State: Odisha District: Jajpur Block: Badchana Gram Panchayat: Badachana
Work Code: OD/356/3394/118238/401700/00038312 (RENOVATION OF MALIA POKHARI)
Project Category: Water Body
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Badchana Proposal Date: -
Date of Commencement: - Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Tank Project Type: Renovation or Rejuvenation
Name of Executant:
Administrative Approval Details
Approval No.:
Technical Sanction Details
Technical Sanction No.:
Fund Sanction No.: 1313
Fund Sanction Amount (in Rs.): 1000000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Earth Work (AR0104) : Earth work in slushy soil (in water upto 0.6m depth requiring the aid of pans and vessels) within 50m. Initial lead and 1.5m initial lift - Earth work in slushy soil (in water upto 0.6m depth requiring the aid of pans and vessels) within 50m. initial lead and 1.5m initial lift as per the direction and specification of the Deparment. Cum 2760 205.3128 566663.328
2 Special items for irrigation works (AR0216A) : Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil within an initial lead of 2 km from the place of excavation complete. - Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 2 km from the place of excavation complete. Per 1 cum. Cum 4657.5 92.8594 432492.6555
Total Amount (in Rs.): 999155.9835
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled
462
Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0104) : Earth work in slushy soil (in water upto 0.6m depth requiring the aid of pans and vessels) within 50m. Initial lead and 1.5m initial lift - Earth work in slushy soil (in water upto 0.6m depth requiring the aid of pans and vessels) within 50m. initial lead and 1.5m initial lift as per the direction and specification of the Deparment. 2760 Cubic Meter 0.44 1214.4
Total Qty 1214.4
Rate Per Man Day 462
Total Amount 561052.8
Total Labour Amount (in Rs.): 561052.8
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRMMR0065 BRMMR0102 BRMMR0110
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0104) :.Earth work in slushy soil (in water upto 0.6m depth requiring the aid of pans and vessels) within 50m. Initial lead and 1.5m initial lift - Earth work in slushy soil (in water upto 0.6m depth requiring the aid of pans and vessels) within 50m. initial lead and 1.5m initial lift as per the direction and specification of the Deparment. 2760 Cum - - - - - -
2 Special items for irrigation works(AR0216A) :.Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil within an initial lead of 2 km from the place of excavation complete. - Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 2 km from the place of excavation complete. Per 1 cum. 4657.5 Cum 1 4657.5 1 4657.5 1 4657.5
Total Qty 4657.5 4657.5 4657.5
Rate Per Unit 1 25.01 65.93
Total Amount 4657.5 116484.075 307068.975
Total Material Amount (in Rs.): 428210.55
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit
No data to display.
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 544 Rs. 544
2 Provision for Contingency @ Rs. 300 Rs. 300
Total Addition Component Amount (in Rs.): 844
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 999999.9835