State: Odisha District: Balangir Block: Balangir Panchayat: Sibtala
Work Code: OD/345/3285/115797/420290/00014797 (Const of CC road at Kundpani Harijan para Under Sibtala GP)
Project Category: Road
Financial Year: 2024-25 Execution Level: Sibtala, G.P
Executing Agency: Panchayat Samiti, Balangir Proposal Date: 28-02-2024
Date of Commencement: 16-01-2025 Date of Completion: 21-04-2025
Scheme Name: SFC Devolution of Fund Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: Jyotranjan Mohanty
Administrative Approval Details
Approval No.: OD/345/3285/115797/420290/00014797/AS
Technical Sanction Details
Technical Sanction No.: OD/345/3285/115797/420290/00014797/TS
Fund Sanction No.: 15384
Fund Sanction Amount (in Rs.): 400000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0101a) :.Earthwork in ordinary soil within 50m, initial lead and 1.5m, initial lift - Earth work in ordinary soil within 50m, initial lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 27.94443408 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 24.10892352 Cum 1 24.10892352 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 31.68862296 Cum - - 2.29 72.5669465784 0.48 15.2105390208 0.96 30.4210780416 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 24.10892352 Cum - - 3.23 77.8718229696 0.45 10.849015584 - - 0.9 21.698031168 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 26.3658714 Sqm - - - - - - - - - - 0.00267 0.070396876638 0.000614 0.0161886450396
Total Qty 24.10892352 150.438769548 26.0595546048 30.4210780416 21.698031168 0.070396876638 0.0161886450396
Rate Per Unit 79.25 0 79.25 248.5 248.5 0 0
Total Amount 1910.63218896 0 2065.2197024304 7559.6378933376 5391.960745248 0 0
Total Royalty Amount (in Rs.): 16927.450529976